1. The Subject Of The Order Is The Construction Of A Garage For The Volunteer Fire Department In Godów And The Modernization Of The Volunteer Fire Department Building In Chodel.2. The Subject Of The Order Includes The Performance Of: 2.1. Task 1 - Construction Of A Garage For A Fire Truck With Infrastructure In Godowo; 2.2. Task 2 - Modernization Of The Volunteer Fire Department Building In Chodel.3. This Investment Is Intended For Co-Financing From The Government Fund For Polish Order: Strategic Investment Program, Hereinafter Referred To As The Programme In Accordance With The Preliminary Promise No. Edycja6pgr/2023/4839/Polskilad Regarding The Implementation By The Chodel Commune Of The Investment: Construction Of A Garage For The Needs Of The Volunteer Fire Department In Godowo And Modernization Building Of The Volunteer Fire Department Station In Chodel4. The Scope Of The Order Includes The Implementation Of Construction Works Based On Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works (Technical Documentation), Under The Supervision Of A Person With Appropriate Construction Qualifications, In Accordance With The Principles Of Technical Knowledge And Construction Art As Well As The Principles And Conditions Of Occupational Health And Safety, In Particular:4.1 . Task 1 - Construction Of A Garage For A Fire Truck With Infrastructure In Godowo: 4.1.1. Demolition Of The Existing Farm Building;4.1.2. Construction Of A Garage Building For A Fire Truck;4.1.3. Construction Of Water Supply, Sanitary Sewage, Electrical And Lightning Protection Installations With A Photovoltaic Installation;4.1.4. Connection To The Water Supply, Sewage And Electricity Networks;4.1.5. Implementation Of An Sswin Alarm System, An External Monitoring System And An Access Control System For External Doors (Including The Use Of Appropriate External Doors);4.1.6. Construction Of Landscaping Elements (Concrete Paving Stones, Green Areas);4.1.7. Providing Surveying Services For The Works Carried Out;4.2. Task 2 - Modernization Of The Fire Station Building In Chodel: 4.2.1. Execution Of Moisture And Thermal Insulation Of Foundation Walls;4.2.2. Performing Thermal Insulation Of External Walls;4.2.3. Performing Thermal Insulation Of The Roof;4.2.4. Replacement Of The Roof Covering Along With The Extension Of The Eaves (Due To The Thermal Insulation Of The Walls), Sheet Metal Work, Gutters, Roof Exhaust Fans;4.2.5. Execution Of The Buildings Lightning Protection System;4.2.6. Renovation Of Garage Floors;4.2.7. Delivery And Installation Of New Window And Door Joinery, Reconstruction Of Bricked-Up Door Openings;4.2.8. Renovation Of Interior Rooms (Toilets, Communication, Staircase) Along With The Performance Of Electrical And Sanitary Works;4.2.9. Replacement Of External Lighting With Led;4.3. Delivery And Installation Of 3D Plastic Inscriptions With The Text Osp Godów And Osp Chodel On Appropriate Buildings, Consisting Of Single Red Letters, 50-70 Cm High Each, Installation Of Letters At Distances Of Min. 2 Cm From The Wall (Final Form Of Inscriptions To Be Agreed With The Ordering Party); 4.4. Carrying Out The Necessary Tests And Examinations, Control Measurements In Accordance With The Requirements Of The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works, Test Results For Approval By The Supervision Inspector;4.5. Preparation Of As-Built Documentation;4.6. Maintaining A Construction Log; 4.7. Preparation Of The Final Settlement And Preparation Of 1 Copy Of The Settlement Report, In Paper Form And In Electronic Version (.Pdf), Which Is To Include: Contract, Offer, Contracts With Possible Subcontractors And Further Subcontractors, Schedule, Tables Of Settlement Elements, Insurance Policy, Transfer Protocol Construction Site, Acceptance Protocols For Works That Disappear And Are Covered Or Obscured, Material Tests, Prescriptions, Measurement Results: Laboratory Test Results, Material Compliance Declarations, Approvals, Contractors Technical Report, As-Built Geodetic Inventory Separately For Each Industry In Gis/Cad Form And Paper Version (3 Copies Each) - Regarding Task 1, Construction Log, Financial Settlement, Confirmation Of Completion Of Acceptance Of Works, Declaration Of Authorized Works Managers On The Execution Of The Task In Accordance With The Regulations And Necessary Documents To Hand Over The Facility For Use;4.8. Tidying Up The Investment Area;4.9. Handing Over The Completed Works To The Owners Of The Property; 4.10. The Contractor Is Also Obliged To Perform Other Works Related To The Implementation Of The Scope Specified In The Attached Design Documentation.5. A Detailed Description Of The Subject Of The Order Is Set Out In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works (Appendix No. 1 To The Swz) And Annex No. 6 - Contract Template.
|