1. The Subject Of The Order Is The Implementation Of The Investment Entitled: Construction Of A Sanitary Sewage System In The Towns Of Czechel, Jedlec, Borczysko. Scope Of Work Including The Construction Of A Sanitary Sewage System In The Town Of Czechel: - Gravity Collector K - 7 Pvc Ø 200 Mm, Length - L = 308, 40 M - Gravity Collector K – 7.1 Pvc Ø 200 Mm, Length – L = 343.80 M - Pressure Pipeline P – 7 Dz 90 Mm Pe, Length – L = 347.40 M - Pumping Station Ps 7 - Gravity Collector K – 8 Pvc Ø 200 Mm, Length – L = 450.70 M - Gravity Collector K – 8.1 Pvc Ø 200 Mm, Length – L = 171.30 M - Discharge Pipeline P – 8 Dz 90 Mm Pe, Length – L = 1161.50 M- Pumping Station Ps 8 - Sewer Lines Ø 160 Mm, Total Length - L = 153.40 M / 19 Pcs. - Branches Of The Sewage Network With A Diameter Of 160 Mm, Length - L = 6.0 M. - Reconstruction And Widening Of The Road Surface To 4 M, Substructure Made Of Cement-Stabilized Soil, Thickness. 15 Cm, Substructure Made Of Crushed Aggregate, Thickness. 23 Cm And Making A Binding Layer Thick. 4 Cm - Construction Of A Wearing Course With A Length Of 712.0 M And A Width Of 4.0 M. Scope Of Work Including The Construction Of A Sanitary Sewage System In Jedlec: - Gravity Collector K - 8 Pvc Ø 200 Mm, Length - L = 745.00 M - Gravity Collector K – 8.1 Pvc Ø 200 Mm, Length – L = 326.00 M - Discharge Pipeline P – 8 Dz 90 Mm Pe, Length – L = 789.00 M - Pumping Station Ps 8 - Gravity Collector K – 5 Pvc Ø 200 Mm, Length – L= 329.40 M - Gravity Collector K – 5.1 Pvc Ø 200 Mm, Length L= 400.90 M - Discharge Pipeline P – 5 Dz 90 Mm Pe, Length – L= 418.80 M- Ps 5 Pumping Station - Sewerage Pipes Ø 160 Mm, Total Length - L = 188 M / 24 Pcs. - Branches Of The Sewage Network With A Diameter Of 200 Mm, Length - L = 25 M - Branches Of The Sewage Network With A Diameter Of 160 Mm, Length - L = 125.6 M - Reconstruction And Widening Road Surface Up To 4 M, Substructure Made Of Soil Stabilized With Cement Thickness. 15 Cm, Substructure Made Of Crushed Aggregate, Thickness. 23 Cm And Making A Binding Layer Thick. 4 Cm - Making A Wearing Course Thick. 4 Cm On A Length Of 725 M And A Width Of 4.0 M Scope Of Work Including The Construction Of A Sanitary Sewage System In Borczysko - Gravity Collector K - 1H Pvc Ø 200 Mm Part From Well S3 To Sr1h, Length - L = 523.00 M - Gravity Collector K - 2H Pvc Ø 200 Mm, Length – L= 731.00 M - Pressure Pipeline T – 1H Dz 90 Mm Pe, Length – L= 5.00 M- Pumping Station P - 1H- Sewerage Pipes Ø 160 Mm, Total Length - L= 144.00 M / 17 Pcs. - Branches Of The Sewage Network With A Diameter Of 200 Mm, Length - L = 67 M - Branches Of The Sewage Network With A Diameter Of 160 Mm, Length - L = 13 M. - Reconstruction Of The Road Surface, Substructure Made Of Cement-Stabilized Soil. 15 Cm, Base Made Of Crushed Aggregate, Thickness. 23 Cm, Making A Binding Layer Thick. 4 Cm And Making A Wearing Course Thick. 4 Cm - Roadside Made Of Crushed Aggregate Moreover, The Subject Of The Order Includes: - Preparation Of An As-Built Geodetic Inventory - Performance Of Tests And Checks Required By Law - Ensuring Conservation Supervision During The Execution Of Construction Works. The Planned Task Includes The Continuation Of The Construction Of A Sanitary Sewage System In Order To Receive Social And Domestic Sewage From The Towns Remaining To Be Sewered. Czechel, Jedlec And Borczysko And Discharging Them To The Sewage Treatment Plant In Gołuchów. In Czechel, The Following Will Be Constructed: - Gravity Collectors With A Diameter Of 200 Mm And A Length Of 1,274 M, - A Pressure Pipeline With A Diameter Of 90 Mm, A Length Of 1,509 M, - Sewage Pumping Stations - 2 Pcs., - Sewers With A Diameter Of 160 Mm With A Total Length Of 153 M - 19 Pcs. In The Town Of Jedlec: - Gravity Collectors With A Diameter Of 200 Mm And A Length Of 1,801 M, - Pressure Pipelines With A Diameter Of 90 Mm, A Length Of 1,208 M, - Sewage Pumping Stations - 2 Pcs., - Sewers With A Diameter Of 160 Mm On The Property, With A Total Length Of 188 M - 24 Pcs. In Borczysko, The Following Will Be Constructed: - Gravity Collectors With A Diameter Of 200 Mm And A Length Of 1222 M, - A Pressure Pipeline With A Diameter Of 90 Mm, A Length Of 5 M, - Sewage Pumping Stations - 1 Pc., - Sewage Drains With A Diameter Of 160 Mm On The Property, With A Total Length Of 144 M - 17 Pcs. As A Result Of The Task, The Towns Of Czechel And Borczysko Will Be Completely Sewered, And The Town Of Jedlec Will Be 90% Sewered. The Task Also Includes The Reconstruction Of The Surface On District And Municipal Roads. The Task Will Be Implemented Under The Government Fund For Polish Order. Strategic Investment Program, Established By Resolution Of The Council Of Ministers No. 84/2021 Of July 1, 2021 (Amended By Resolution No. 176/2021 Of December 28, 2021 And Resolution Of The Council Of Ministers No. 87/2022 Of April 26, 2022)
|