1. The Subject Of The Order Is The Renovation Of The Facade Of The Stage Chimney (Without The Crowning Cornice) In Terms Of Plastered Walls Based On The Construction Design For The Conservation Renovation Of The Facade Of The Main Building Of The Grand Theater In Łódź, Entered In The Register Of Monuments Under No. A/202, Together With The Reconstruction Of The Main Entrance Stairs As Part Of Investment Task: Modernization Of The Grand Theater In Łódź. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation, Constituting Annex No. 4 To The Swz, Which Includes: Construction Design, Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities - In Some Of The Works Covered By This Order. 2. Design Documentation Listed In Point 1 Contains A Detailed Description Of The Subject Of The Order, Technical Specification Of The Execution And Acceptance Of Works, Bill Of Quantities And Other Information Necessary For The Proper Implementation Of The Subject Of The Order. 3. The Works Covered By The Subject Of The Order Should Be Performed In Accordance With The Received Design Documentation And Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities, Contract And Conditions Contained In The Swz And The Principles Of Technical Knowledge And Construction Art, Based On The Applicable Provisions Of The Construction Law And Issued On Their Basis Implementing Acts, Provisions Of The Civil Code And Others Resulting From The Specific Nature Of The Subject Of The Order.4. The Scope Of Tasks Covered By The Subject Of The Order Includes In Particular: 4.1. Renovation Of The Plastered External Walls Of The Stage Chimney Of The Main Building Of The Grand Theater In Łódź, Insulated With Polystyrene In The High Part Without The Crowning Cornice: A) Cleaning The Walls With A Pressurized Water Jet With The Addition Of Biocide, B) Applying A Reinforced Layer (Reinforcing The Plaster), C) Applying A Plaster Primer ,D) Coating With Thin-Layer Flat Silicate And Silicone Plaster (Including Repairing Cracks In The Substrate Under The Plaster),E) Painting The Facade With Silicone Paint.4.2. Replacement Of All Sheet Metal Flashings On The Façade Of This Part Of The Stage Chimney With Titanium-Zinc 0.7 Mm Thick Ones With A Backing Made Of Osb-3 Board. 2 Cm. 4.3. Preparing And Presenting The Scaffolding Foundation And Fastening Design To The Investor Supervision Inspector For Approval. Preferred Frame Scaffolding, Wall System Covering At Least One Wall. The Ordering Party Allows Work With Ropes.4.4. Drawings: We10 And E08 Have Been Revised And Detailed In Drawings: We10 Revision 1 And E08 Revision 1, Which Constitute Attachments To The Design Documentation.5. The Works Covered By The Subject Of The Order Will Be Performed On An Active, Used Facility. All Work Can Be Performed On Any Day Of The Week At Hours Agreed With The Ordering Party (Including The Opening Hours Of The Theatre). 6. The Ordering Party Requires That The Offer Covers The Full Scope Of The Order. The Purchaser Does Not Allow Partial Submissions. Justification: The Construction Works Were Agreed With The Łódź Provincial Conservator Of Monuments And Confirmed By Decision Wuoz-Zn.5142.29.2024.Es Of January 18, 2024. All Construction Works Will Be Carried Out At A Height Of 25 To 40 M Above The Level Of Dąbrowski Square In A Space Limited By Temporarily Built External Scaffolding. This Space Significantly Limits The Freedom Of Movement Of Work Teams. Taking Into Account The Need To Ensure Safe Conditions For The Execution Of Works, It Is Not Advisable To Allow Several Independent Contractors To Carry Out The Commissioned Works. Coordination Of The Activities Of Contractors Implementing Individual Parts Of The Order Could Seriously Jeopardize The Proper Execution Of This Order. Moreover, The Lack Of Dividing The Contract Into Lots Will Not Distort Competition By Limiting The Ability Of Smaller Entities, In Particular Small And Medium-Sized Enterprises, To Apply For The Contract.7. The Ordering Party Indicates That Activities Related To The Renovation Of The Thermal Modernization Of The External Plastered Walls Of The Stage Chimney Of The High Part Of The Main Building, And The Replacement Of Sheet Metal Flashings Must Be Performed By Persons Employed Under An Employment Contract Within The Meaning Of The Provisions Of The Act Of June 26, 1974 - Labor Code.8. Documenting The Employment Of Persons Performing The Activities Indicated In Point 7 At The Stage Of Submitting Offers By Contractors Will Consist In Submitting A Declaration Included In The Offer Form, Constituting An Attachment To The Swz.9. During The Execution Of The Order, The Ordering Party Is Entitled To Perform Inspection Activities Towards The Contractor Regarding Compliance By The Contractor Or Subcontractor With The Requirement Of Employing, Under An Employment Contract, Persons Performing The Activities Indicated In Point 7. In Order To Verify The Employment By The Contractor Or Subcontractor Under An Employment Contract. , Persons Performing The Activities Indicated By The Ordering Party In The Scope Of Execution Of The Order, The Ordering Party Provides For The Possibility Of Requesting From The Contractor, Within The Deadline Set By The Ordering Party, In Particular:9.1. Declaration Of The Employed Employee,9.2. Declarations Of The Contractor Or Subcontractor On The Employment Of An Employee Under An Employment Contract,9.3. A Certified Copy Of The Employment Contract Of The Employed Employee,9.4. Other Documents − Containing Information, Including Personal Data, Necessary To Verify Employment Under An Employment Contract, In Particular The Name And Surname Of The Employed Employee, The Date Of Conclusion Of The Employment Contract, The Type Of Employment Contract And The Scope Of The Employees Responsibilities.10. Failure By The Contractor To Submit The Evidence Requested By The Ordering Party To Confirm That The Contractor Or Subcontractor Has Met The Employment Requirement Under The Employment Contract Within The Deadline Set By The Ordering Party Will Be Treated As The Contractors Or Subcontractors Failure To Meet The Requirement To Employ Persons Performing The Activities Specified In Point 7 Under The Employment Contract. 11. In Case Of Justified Doubts As To Compliance With Labor Law By The Contractor Or Subcontractor, The Ordering Party May Request An Inspection By The National Labor Inspectorate.
|