Refuse-Incineration Plant Construction Work – Construction Of An Installation For Thermal Transformation Of Pre-Processed Municipal Waste (Prerdf/Rdf) In Suwałki. 1. The Subject Of This Order Is The Construction Of An Installation For The Thermal Processing Of Municipal Waste With A Capacity Of 2.95 Mg/H And A Calorific Value Of 12 Mj/Kg. The Investment Will Include The Following Installations And Facilities: A. Waste Unloading Hall, B. Waste Bunker, C. Steam Boiler, D. Steam Turbine Set With A Heat Exchanger, E. Flue Gas Treatment Installations With A Chimney And Emission Monitoring System Pollutants Into The Air, F. Auxiliary Installations (Preparation Of Water, Compressed Air, Fire-Fighting Power Generator), G. Electrical Power Output System, H. Heat Output System, I. Administrative And Social Building, J. Truck Scales, K. Road System , Parking Lots, Sidewalks, Street Furniture, Internal And External Sanitary Installations. The Contractor Will Also Perform All Necessary Designs And Obtain Decisions Necessary To Use The Installation. The Order Is To Be Carried Out On A Turnkey Basis, Which Means Comprehensive Design, Delivery, Construction, Assembly, Commissioning, Commissioning And Commissioning. This Formula Includes The Implementation Of All Designs, Supplies, Services And Construction And Assembly Works, As Well As Obtaining All Decisions Necessary For The Subject Of The Contract To Achieve The Required Operational Characteristics, Guaranteed Technical Parameters, Full Mobility And Can Be Used In Accordance With Its Intended Purpose. . 2. The Investment Involves The Construction Of A Complete Installation For Thermal Treatment Of Pre-Processed Municipal Waste (Itpok) Consisting Of One Technological Line With A Maximum Capacity Of 2.95Mg/H. Fuel Produced On The Basis Of Residues From Sorting Municipal Waste With A Calorific Value Ranging From 8 To 16 Mj/Kg Will Be Sent To Itpok. The Scope Of Itpok Will Include The Main Technological Nodes Necessary For Development: • Charge Acceptance And Buffering Node, • Combustion Node, • Energy Recovery Node, • Energy Conversion Node, • Flue Gas Treatment Node, • Automation And Measurement Node, Installations And Auxiliary Devices. The Investment Will Include The Following Facilities: • Scales With A Porters Lodge, • Unloading Hall, • Bunker/Storage Hall, • Thermal Conversion Hall With Exhaust Gas Treatment And Control Room, • Slag Warehouse, • Chimney, • Machine Room With Turbogenerator, • Social And Office Space, • Fire Protection Water Tank, • Roads And Maneuvering Areas. In Addition To The Above Of The Main Facilities In The Itpok Area, The Following Accompanying Elements Will Be Located: • Deodorization Station, • Auxiliary Fuel Tank, • Ammonia Water Or Urea Tank, • Soda / Lime Reagent Tank, • Active Coal / Coke Tank, • Silo For Residues From Flue Gas Purification, • Boiler Dust Silo (Optional), • Condenser/Cooler, • Power Generator. The Electricity Produced In The Installation Will Primarily Be Used To Cover The Companys Own Needs
|