Communications Equipment – Modernization Of The Telecommunications Infrastructure. The Regensburg University Hospital (Ukr) Operates A Networked Telecommunications System From The Manufacturer Philips/Nec Including A Comprehensive Ip-Dect Infrastructure With Various Applications And Central Management, Which Has Been Further Developed And Modernized Since The Clinic Was Founded. The Last Modernization Was Carried Out As Part Of An Interim Solution In 2023 To Bring Critical Components From The Is3000 System, For Which The Service Was Discontinued By The Manufacturer At The End Of 2023, Up To Date Based On Sv9500 Systems. The Aim Of This Procurement Is To Build A Central, Virtualized And Highly Available Communication Solution In The Ukr Data Center With Ip Telephony, Acd, Ucc, Ip-Dect And Alarm And Information Servers. For This Purpose, A Highly Available Telecommunications Infrastructure Is Being Set Up In The Ukr Data Center, Which Makes All Licenses And Functions Available Centrally. A Proof Of Concept Will Be Carried Out As Part Of The Pilot. If The Tests Are Not Completed Successfully, The Client Has The Right To Withdraw From The Contract. All Existing Ip Devices Are Replaced By New Ip Devices. In Addition, Where Technically Possible, Digital And Analogue Devices Should Be Replaced By Ip Devices. In The First Expansion Stage, Wired Digital Devices Must Also Be Connected Where No Ip Infrastructure Can Be Provided At The Time Of Installation. The Existing Ip-Dect System Including The Mobile Dect Devices Will Be Replaced With A New System. For The Duration Of The Migration, A Connection Must Be Established To The Existing System, Which Enables Parallel Operation Of Both Systems With Gradual Migration Of The Participants To The New Telecommunications System Until The Migration Is Completely Completed And Accepted. The Client Will Prepare The Network Infrastructure On Site In Close Consultation With The Contractor To Such An Extent That The Contractor Can Install The System Ready For Operation. Data Distributors For Installing Telecommunications And Lan Components Are Provided On Site. It Can Be Assumed That The Ip Telephones For The Administration And Duty Room Area Can Be Set Up In Parallel To The Existing Infrastructure, Since The Existing Communication Solution Is Largely Connected To Tdm Devices Or Analogue Devices Via 2/4-Wire Copper Cabling And The New Solution Via Ip Network Connection (Cat. 5/6/7). Existing Ip Devices Will Be Replaced Individually As Part Of The Rollout. Cabling Work (Connections From New Tk Gateways To The Hvt) Must Be Carried Out By The Contractor. It Should Be Noted, For Example, That The Existing Cabling From The Hvt To The Existing Wired Connections, E.G. Analogue Devices Or Fax Machines, Must Be Used If They Are Migrated To The New System. There Is The Option Of Designated, Modernized Parts Of The Nec Existing System
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79216006
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.