Lot 1 - Soil Material H=1, 50M Pavement Interventions, Lot 1 - Rock Dismantling Using Pyrotechnic Fireworks, In Trench, Including Removal, Loading, Unloading, Transport Including Removal, Unloading And Transport., Lot 1 - Mechanized Excavation From Trench In Rocha To Fogo, Including Loading, Unloading And Transport, Lot 1 - Mechanized Cold Excavation Of Trench In Rocha Branda, Unloading And Transport Including Load, Lot 1 - Trench Shoring, Lot 1 - Manual Excavation Soil Material, Lot 1 - Pavement Recomposition With Cobblestones, With Reuse (Removal And Placement) With Reuse: Removal And Placement., Lot 1 - Sidewalk In Simple Concrete, Molded In Place, Machined, Finishing, Conventional Conventional Finish., Lot 1 - Sidewalk In Reinforced Concrete , Esp. 6Cm, Conventional Finish, With 5.0Mm Screen - Mesh 10 , Lot 1 - Execution Of Interlocking Flooring (With Reuse And With Removal) Reuse And With Removal., Lot 1 - Execution Of Stone Flooring, With Reuse And Removal, Lot 1 - Recomposition Of Asphalt Pavement (Cbuq) Recomp. Trenches Recomposing Asphalt Pavement (Cbuq) For Recomposing Trenches (With Removal Without Reuse), Lot 1 - Recomp. De Placas Regulares De Basalt, Inc. Settlement Base Recomposition Of Regular Basalt Slabs, Including Settlement Base, Lot 1 - Recomp. Of Irregular Basalt Slabs, Inc. Assen Base Recomposition Of Irregular Basalt Slabs, Including Laying Base, Lot 1 - Recomposition Of Stoneware Slab, Incl. Settlement Base Stonestone Slab Recomposition, Lot 1 - Manual Backfilling, Lot 1 - Mechanized Backfilling With Trench Material, Lot 1 - Mechanized Backfilling With Borrowed Material, Lot 1 - Backfilling With Crushed Powder, Lot 1 - Branch Connection On Network L=2.00M - Manual Excavation Branch Connection On Network L= 2.00M With Labor, Materials And Equipment - Manual Excavation - (Supply Of Hydraulic Materials By Ivoti Water), Lot 1 - Branch Connection On Network L=4, 00M - Manual Esc. Branch Connection On Network L=4, Materials And Equipment - Manual Excavation (Supply Of Hydraulic Materials By Ivoti Water), 00M - Mechanized Esc. Branch Connection On Network L=2 , Materials And Equipment - Mechanized Excavation (Supply Of Hydraulic Materials By Water From Ivoti), 00M - Mechanized Esc. Connection Of Branch In Network L=4, Materials And Equipment - Mechanized Excavation (Supply Of Hydraulic Materials By Water From Ivoti), Lot 1 - Installation Of Parts, Connections And Registers Installation Of Parts, Connections, Registers From 50Mm To 300Mm (Hydraulic Hour) From 50Mm To 300Mm (Hydraulic Hour). And Labor Included Pipes, Machines And Labor., Lot 1 - Repair To 400Mm Storm Sewer Network Repair To 300Mm Storm Sewer Network Including Pipes, Lot 1 - Repair To 500Mm Storm Sewer Network Repair To 500Mm Storm Sewer Network 300Mm Including Pipes, Lot 1 - Repair To Storm Sewer Network 600Mm Including Pipes, Lot 1 - Temporary Network Connection In Replacements - From 63Mm To 315Mm (Hydraulic Time) From 63Mm To 315Mm (Hydraulic Time)., Lot 1 - Masonry Box For Suction Cups (0.80 X 0.80)M Includes: Concrete Block Masonry, Plaster
|