Cleaning The Subfloor With A Dry Broom. Af_04/2019, Connection Painting (Execution And Supply Of Bituminous Material, Exclusive Transport Of Bituminous Material), Transport Of Material Of Any Nature. Average Transport Distance Greater Than Or Equal To 50, 10 Km, Hot Machined Bituminous Concrete - Cbuq (Execution, Including Machining, Application, Spreading And Compaction, Supply Of Aggregates And Bituminous Material, Excludes Transport Of Aggregates And Bituminous Material To Plant And From The Ready Mix To The Track, Transport Of Hot Machined Bituminous Concrete. Average Transport Distance ≫ 50.00 Km (Compacted Volume), Manual Removal Of Interlocking Or Hexagonal Paving In Precast Concrete, With Reuse, Including Removal And Stacking, Exclusive Transport And Removal Of Non-Reusable Removed Material, Manual Loading Of Material Of Any Nature On Truck, Exclusive Transport, Transport Of Material Of Any Nature On Truck, Distance Greater Than 2Km And Less Than Or Equal To 5Km, Within The Urban Perimeter, Exclusive Loading, Including Unloading, Paving Rental. Af_10/2018, Horizontal Excavation In 1St Category Soil With Crawler Tractor (170Hp/Blade: 5, 20M3). Af_07/2020, Loading, Maneuvering And Unloading Soil And Granular Materials In A 6 M³ Dump Truck - Loading With Hydraulic Excavator (1, 20 M³ / 155 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, Transport With 6 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Clay Or Clay For Landfill/Backfill (With Transport Up To 10 Km), Crushed Stone Or Bica Corrida, Not Classified (Quarry Station/Supplier, No Freight), Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_07/2020, Execution And Compaction Of Base And Or Sub-Base For Paving Granulometrically Stabilized Soils With Mixture Of Soils On Track - Excluding Soil, Excavation, Loading And Transport. Af_11/2019, Priming (Execution And Supply Of Bituminous Material, Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Exclusive Cargo And Transport. Af_11/2019, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/ 2020, Execution Of Machined Concrete Gutter, Molded In Situ In A Straight Section, 30 Cm Base Smooth Sewage Collector (Jei), Dn 150 Mm (6), Including Connections, Concrete Walkways E = 8 Cm, Fck = 15 Mpa City Hall Standard
|