Laboratory, Optical And Precision Equipments (Excl. Glasses) – Acquisition Of Emc Equipment. Procurement Of The Necessary Equipment To Operate The Emc Chamber In The Emc Lab Owned By The University Of Miskolc As Follows: 1 New Emc Measuring Software, 1 New Rf Current Measuring Coil, 1 New Rf Current Measuring Coil, 1 New Rf Current Measuring Coil Calibration Device, 3 New 5Uh/50 Ohm V Network, 1 New Pulse Limiter, 1 New Field Strength Measuring Sensor, 1 New Signal Generator, 1 New Power Meter, 1 New 6 Ghz Power Measuring Head, 2 New 18 Ghz Power Measuring Heads , 1 New Amplifier System, 1 New Broadband Logperiodic Antenna, 1 New Current Input System, 1 New Coax Termination, 1 New 30Db Rf Attenuator, 2 New Optical Can-Fd Converters, 1 New Optical Lin Converter, Purchase Of 1 New Stripline, 1 New Camera. Extension Of The Cabling Of The Existing Albatross Project Type Sac3 Emc Measuring Chamber With The Rf Cabling Required For Conducting Immunity Tests. When Designing The Cabling, The Continuity Of The Existing Warranty Of The Emc Measuring Chamber Must Be Ensured, It Is The Responsibility Of The Tenderer. - ½” Cable System With N Connectors From The Emc A-Band Amplifier To The Floor Box In The Measuring Chamber And From There To The Test Table. Allowed Cable Attenuation From The Output Of The Amplifier To The Floor Box At The Test Table Maximum: 1.2Db @400Mhz - ½” Cable System With N Connectors From The Transition Point On The Wall Of The Emc Measurement Chamber To The Floor Connection Box At The Measurement Distance Of 3M. - 7/8 Cable System With 7/16 Connectors From The Wall Feed-Through To The Floor Box Connection With A Measurement Distance Of 1M. Permitted Cable Attenuation From The Wall Feed-Through To The Floor Box For A Measurement Distance Of 1M Maximum: 0.5Db @200Mhz - Rf Cable From The Output Of The Bc Band Amplifier To The Wall Feed-Through, Which Can Withstand The Full Power Of The Amplifier. The Cable Must Be Flexible. Its Maximum Attenuation Cannot Be More Than 0.2Db @200Mhz - Rf Cable From The Floor Box With A Measuring Distance Of 1M To The Measuring Antenna, Which Can Withstand The Full Power Of The Amplifier. The Cable Should Be Flexible To Facilitate Changing The Antenna Polarization. - A Measurement Protocol Must Be Prepared For The Cabling, Which Includes The Measurement Of The Attenuation And Reflection Factor Of The Installed Cables. The Reflection Factor Of Cables And Connectors Must Be Better Than 25Db In The Frequency Range 30Mhz - 1Ghz. Commissioning Measurement: Commissioning With Test Operation. Materials Required For Commissioning And Test Operation Are Provided By The Supplier. After Commissioning The Equipment, Perform Control Measurements As Follows: - Presentation Of Emc Measurement Software Parameterization In Hungarian. Transferring The Previous Measurement Procedures From The Existing Emc32 Type Measuring Software To The Proposed Emc Measuring Software - Cispr25 Conducted Immunity Measurement - Cispr25 Radiated Immunity Measurement - Checking The Generated Field Strength Values With A Calibrated Field Strength Meter. Regarding All Devices: Upon Delivery Of The Devices, The User Manual In Hungarian Or English, As Well As The Ce Certificates
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79137180
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.