Railway Equipment – Installation Fixe Vidange Wc - St Etienne. As Part Of The Creation Of A New Ter Equipment Maintenance Workshop On The St Etienne Chateaucreux Site In The Auvergne Rhône Alpes Region, The Sncf Wishes To Equip Itself With A Fixed Wc Emptying Installation On Tracks 6 And 7 To Empty Regio2n Trains Of 83M 6 Boxes And 110M 8 Boxes As Well As A Sand Distribution Installation Subject To A Second Specification. The Purpose Of The Consultation Is To Provide Technical Studies For The Installation Of A Fixed Toilet Drain Installation. The Wc Emptying Installation Will Consist Of At Least: • Wc Points Distributed On The Central Platform Of Tracks 6 And 7. • 1 Flushing Circuit (Clear Water); • 1 Effluent Suction Circuit; • An Effluent Storage Tank Equipped With Its Various Indicators And Sensors; • 1 Compressed Air Unit; • 1 Effluent Retention Tank; • 1 Odor Limiting Filter; • 1 Control Cabinet; • A Pipe Network Connecting The Wc Points To The Wc Technical Room. The Filling Rate Is Estimated At Around 12 Us Trains Per Week.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79095589
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.