1. The Subject Of The Order Is The Renovation Of The District Road No. 1003R Zdziechowice-Potoczek, On The Section From Km 0,000.00 To Km 2+725.00, Excluding The Railway Area From Km 2+473.4 To Km 2+512.1, I.E. On The Section With A Length Of Approx. 2686.3 M2. The Scope Of Work Includes: Renovation Of The Existing Road Surface By Making New Structural Layers Of Asphalt Concrete, Renovation Of The Surface Of Existing Exits, Renovation Of Existing Roadsides, Drainage Elements, And Accompanying Works 3. The Detailed Scope Of Work Necessary To Be Performed Is Described In The Design Documentation, Bill Of Quantities And Detailed Technical Specifications For The Execution And Acceptance Of Construction Works Constituting Annexes To The Swz.4. The Material Scope Of The Project Also Includes All Activities And Costs Resulting From The Design Documentation, Bill Of Quantities, Technical Specifications For The Execution And Acceptance Of Construction Works, Construction Practices, Obtaining Approval For Operation Of The Installed Devices, The Cost Of Surveying Works, And Costs Related To The Arrangement, Maintenance And Security Of The Construction Site. , Costs Related To The Implementation Of The Signage Design And Traffic Organization For The Duration Of The Works, Along With Agreeing, Purchasing, Installing And Maintaining The Signage. 5. During The Execution Of The Order, The Contractor Will Ensure Constant Passability Of The Road Under Renovation. The Ordering Party Does Not Allow For The Possibility Of Complete Closure Of The Road.6. During The Execution Of The Order, The Contractor Will Ensure Uninterrupted Operation Of The Underground Utilities Network. 7. The Contractor Is Obliged To Cover The Costs Related To The Need For Access To The Land Utilities Network, Owners Supervision, Temporary Exclusion From Use And Their Restart, And Inclusion Of The Rebuilt Networks Into The Active Network. 8. Materials Obtained From Demolition: 1) Dismantled Road Sign Posts And Shields To Be Transported And Transferred To The District Roads Authority In Stalowa Wola, 2) Materials From Surface Milling To Be Transported And Managed By The Contractor. 3) Paving Materials With Utility Value Should Be Cleaned, Sorted, Placed On Pallets - The Pallets Are Secured By The Contractor, Wrapped And Delivered To The Place Indicated By The Ordering Party At A Distance Of Up To 10 Km4) Other Materials Obtained During The Works With Utility Or Material Value Will Be Delivered To The Place Indicated By The Employer At A Distance Of Up To 10 Km5) Material From The Demolition Of The Substructure Layers Of The Existing Surface, I.E. Aggregate, Soil From Excavations To Be Used By The Contractor.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79028286
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.