1. The Subject Of The Investment Is The Construction And Basic Equipment Of The Health Center In Czerniejewo Along With Land Development And Accompanying Infrastructure On Plots With Registration Numbers 252/2, 278/1, 279/1, 280/1, 252/2, Czerniejewo District.2. Basic Information About The Designed Building: 1) Single-Story Building With A Service Function. There Are 5 Medical Service Premises Planned In The Facility. The Premises Include Offices, Waiting Rooms And Social And Technical Rooms With Sanitary Facilities. To Enable Maximum Flexible Arrangement Of Space, A Three-Nave Structural System Was Proposed. Rooms Intended For Permanent Stay Of People, Where Natural Lighting Is Required, Are Located In Two External Aisles. The Center Of The Building Was Intended For Additional Rooms Such As Waiting Rooms, Warehouses And Sanitary Facilities. The Building Has A Clear Height Of At Least 3.0 M. The Premises Have A Common Boiler Room Located At The Back Of The Building. The Design Uses A Clear Spatial Layout And A Simple Language Of Architectural Forms With Balanced Proportions And Composition, Resulting From The Adopted Functional Layout Of The Building. The Facility Was Designed On A Rectangular Plan. The Divisions Of The Facades Were Accentuated By The Entrances To The Premises Designed In Arcades. Rustication Of The Plaster Was Introduced In The Dominant Horizontal Layout. The Designed Building Meets The Requirements Of The Local Development Plan Regarding The Functions And Adaptation Of The Designed Buildings To The Existing Landscape Through The Facade Materials Used.2) The Building Will Be Equipped With The Following Installations: A) Water Supply B) Sanitary Sewage System C) Ventilation D) Air Conditioning E) Gas F ) Vacuum Drainage Of The Roofg) External Heating Installation For The Heat Pumph) Rainwateri) Central Heating Powered By The Heat Pump And A Gas Boiler Room With Underfloor Heating Throughout The Facility.J) Electrical, Including: Power Installations And Plug Sockets, Basic Lighting, Emergency Lighting, Surge Protection, Protection Against Electric Shock, Lightning Protection And Grounding, Lan, Call System, Photovoltaic Installation, Fire Protection Switch, Ag, Tg1, Tg2, Tk Switchboards K) External Fire Hydrant.3. Water Supply And Sanitary Sewage Connections Should Be Made And The Gas Connection To The Building Under Construction Should Be Modernized.4. The Building Will Be Adapted To The Needs Of Disabled People.5. As Part Of The Land Development Project, The Following Should Be Carried Out: A) Hardening The Area By Constructing Maneuvering Roads, Parking Spaces And Sidewalks Constituting The Communication Infrastructure Around The Building. B) Delivery And Installation Of External Lighting Lamps, Benches With Backrests, Steel Baskets And A Bicycle Rack.6. As Part Of The Order, The Health Center Rooms Should Be Equipped With The Following Elements: Doormats, Hangers, Chairs; Including Childrens, Swivel, With Adjustable Seat Depth, Waiting Room Chairs With Upholstered Seats And Backrests, Semaphore Signs, Poufs, Rehabilitation Tables, Soap And Disinfectant Liquid Dispensers, Towel Containers, Waste Bins, A Station For Blood Collection And Vaccination Injections, Medical Stools, Metal Containers, Desks, Mobile Medical Cabinets, Baby Examination Table, Baby And Small Child Changing Station, Toilet Brushes, Illuminated And Unlit Mirrors, Sanitary Cabins, Hand Dryers, Tables For Cafes, Dining Rooms And Canteens, Wardrobes Clothing, Office Kitchens With Sinks And Taps, Modular 2- And 3-Seater Sofas, Metal Filing Cabinets, Two-Door Wardrobes With Shelves, Shelves, Wooden Couches With A Cut-Out For The Face, Rehabilitation And Massage Tables, Cabinets For Cleaning Products, Upholstered Beds , Foam Mattresses, Modular Furniture. The Order Is Co-Financed By The Government Fund Polish Order: Strategic Investment Program
|