1. The Subject Of The Order Is The Renovation Of Municipal Road 560861K (Ul. Słowackiego) In Wieliczka, 476 M Long. The Task Is Carried Out Under The Government Road Development Fund. The Entire Area Is Located Within Road Plots. 1.1. The Scope Of The Reconstruction Includes: Construction Of A Left-Side Sidewalk, Renovation Of Existing Individual Exits, Strengthening And Protection Of Road Slopes, Situational And Height Connections To The Existing Road Edge, Reconstruction And Construction Of Technical Devices For Road Drainage, And Cutting Down Conflicting Greenery. 1.2. The Scope Of Works Includes, Among Others: - Measuring Works - 476 M, - Milling Of Asphalt Surfaces With Removal Of Asphalt Bark To Storage Yards (Milling To A Target Depth Of 13 Cm) - 3,499 M2, - Earthworks Performed With Excavators And Removal Of Excavated Material - 302.5 M3 , - Profiling And Compaction Of The Subgrade For The Construction Layers Of The Pavement - 550 M2 - Base Made Of Natural Aggregates Stabilized With Cement (Bottom Layer, 25 Cm Thick) - 550 M2, - Base Made Of Crushed Aggregates (Bottom Layer, 20 Cm Thick) - 2,911 M2 , - Foundation Made Of Crushed Aggregates (Upper Layer, Thickness 10 Cm) - 2,911 M2, - Vertical Adjustment Of Manholes For Underground Equipment, Canal Manholes - With Renovation Of The Upper Part Of The Manholes, Replacement Of Relief Rings, Manhole Plates And Manholes With Self-Leveling Cast Iron And Concrete Manholes – 60 Pcs.,- Vertical Adjustment Of Manholes For Underground Devices, Sewer Manholes – Including Replacing The Manholes With Cast-Iron And Concrete Ones – 10 Pcs.,- Vertical Adjustment Of Manholes For Underground Devices, Telecommunications Manholes – 39 Pcs.,- Vertical Adjustment Of Manholes For Underground Devices , Water And Gas Valves - 52 Pcs., - Vertical Adjustment Of Manholes For Underground Equipment, Street Sewage Grates - 23 Pcs., - Mechanical Cleaning And Sprinkling With Cold Asphalt Emulsion - 3,393.6 M2, - Leveling The Existing Foundation With A Mineral And Bituminous Mixture - 254.52 T, - Strengthening The Ground With Geogrids (R=Min. 100/100 Kn/M) – 3,393.6 M2, - Surfaces Made Of Mineral-Bituminous Mixtures (Binding Layer, 6 Cm Thick) – 3,393.5 M2,- Surfaces Made Of Mineral-Bituminous Mixtures (Wearing Layer, 4 Cm Thick ) - 3,458.6 M2, - Dismantling Concrete And Stone Curbs - 955 M, - Dismantling Sewage From Stone And Concrete Cubes - 70.4 M2, - Dismantling The Surface Of Concrete Cubes On Cement And Sand Ballast - 2,361 M2, - Footings For Curbs , Edges And Sewage, Concrete With Resistance - 98.01 M3, - Granite Curbs Without Footings, Cut 15X25 On Cement And Sand Ballast - 955 M, - Concrete Edges 30X8 Cm On Sand Ballast With Joints Filled With Sand - 182 M, - Paving Of The Sidewalk Made Of Concrete Cubes, Thick 8 Cm On Sand Bedding With Joints Filled With Sand - 120 M2, - Sidewalks Made Of Concrete Paving Stones, Thickness. 8 Cm On A Cement-Sand Or Grit Ballast, Gray Cubes - 1,865.8 M2, - Sidewalks Made Of Concrete Paving Stones, Thickness. 8 Cm On Cement And Sand Ballast, Yellow Integration Cubes - 19.2 M2, - Passages Through The Sidewalk Made Of Concrete Paving Stones, Thickness. 8 Cm, Red Cubes - 476 M2, - Horizontal Road Marking With Chlorinated Rubber Paint, Continuous Segregation And Edge Lines, Mechanical Painting - 1 Set. Before Starting The Works, The Contractor Will Be Obliged To Develop A Temporary Traffic Organization Design For The Duration Of The Works And Agree It With The Traffic Management Authority. The Detailed Scope Of The Task Should Be Performed In Accordance With The Bill Of Quantities, The Technical Specification For The Execution And Acceptance Of Works And The Technical Documentation, Which Constitute Attachments To Swz.2. If The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials Or Standards, Approvals, Specifications And Systems Referred To In Art. 99 Section 5 Of The Public Procurement Law, The Ordering Party Allows The Offer Of Materials Or Equivalent Solutions Provided That They Guarantee The Proper Implementation Of The Works And Ensure That Technical Parameters Are Not Worse Than Those Assumed In The Above-Mentioned Documents, I.E. In Particular In The Technical Documentation, In The Bill Of Quantities And In The Detailed Technical Specifications. . A Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solution He Offers Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches To The Offer A List Of Equivalent Solutions, As Appropriate, Together With Its Description Or Standards.3. The Ordering Party Requires The Contractor To Provide At Least A 60-Month Guarantee And Warranty For The Works Performed, Counting From The Date Of Final Acceptance. Extending The Guarantee And Warranty Is One Of The Criteria For Evaluating Offers.4. Additional Information Regarding The Subject Of The Order: 4.1.1) The Contractor Will Make The Subject Of The Order Using Its Own Materials And Equipment. The Materials And Devices Used Should Comply With Declarations Of Compliance With Polish Standards, Certificates And Technical Approvals. The Contractor Is Obliged To Have Valid Documents For The Materials Used Confirming Permission To Use/Install Them (E.G. Approvals, Certificates, Technical Approvals, Declarations Of Conformity). The Transport Of Materials To The Construction Site And The Delivery And Operation Of Machines And Devices Are The Responsibility Of The Contractor. The Contractor Is Obliged To Perform Construction Works In Accordance With Construction Practice, Applicable Regulations And Standards And In Compliance With Occupational Health And Safety And Fire Protection Regulations. And Maximum Reduction Of The Nuisance Of Works. The Contractor Also Guarantees The Execution Of The Subject Of The Order Under The Supervision Of Persons With The Required Professional Preparation To Perform Independent Functions In The Construction Industry. 4.1.2) During The Performance Of The Works, The Contractor Is Responsible For The Safety Of His Employees And Other Persons Present Within The Transferred Construction Site Due To The Works Carried Out. 4.1.3) Before Proceeding With The Final Acceptance Of The Works, The Contractor Presents The Ordering Party With Reports On The Tests And Examinations Performed That Were Necessary For The Proper Execution Of The Order, Certificates Or Approvals For The Materials Used, And Documentation Regarding The Construction Works Performed (As-Built Inventory).5. In Order To Secure The Implementation Of The Subject Of The Order, The Ordering Party Obliges The Contractor Whose Offer Is Selected As The Most Advantageous In These Proceedings To Have Paid Civil Liability Insurance For The Activities Related To The Subject Of The Order Throughout The Entire Period Of The Order In The Amount Of At Least Pln 500,000.00.6. The Ordering Party Pursuant To Art. 95 Section 1 Of The Public Procurement Law Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing Activities Related To The Execution Of The Order, In Accordance With Point 20.2. Swz.7. The Ordering Party Informs That It Is Possible To Conduct An On-Site Visit, But It Is Possible To Submit An Offer Without It. The Ordering Party Does Not Anticipate Rejecting The Offer Of A Contractor Who Did Not Carry Out An On-Site Visit As Part Of The Proceedings In Question. Due To The Fact That The Future Construction Site Is Generally Accessible And Not Fenced, It Is Possible For Interested Contractors To Carry Out An Optional Site Visit On Their Own. All Necessary Documents Are Posted On The Website Of The Ongoing Procedure And Therefore The Ordering Party Does Not Provide For The Possibility Or Requirement For The Contractor To Check The Documents Necessary To Complete The Order Available On-Site At The Ordering Party.
|