5.3 - Slab With Mortar, Ratio 1:2:3 (Cement, Sand And Stone), Applied With A Spoon, Esp. 5Mm, Mechanical Preparation:, 1.1 Supply And Placement Of Work Plate In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including With Pva Paint Two (2) Demaossupport In Painted Autoclaved Eucalyptus:, 1.2 Gate In Galvanized Tube 2 1/2 With Wire Mesh 12 # 1/2:, 1.3 Fence In Concrete Moors, With Galvanized Wire Mesh (Including Concrete Wall). Af_05/2018:, 1.4 Planting Of Emerald Grass On Plates, Including Vegetable Land And Conservation For Thirty (30) Days:, 1.5 Executive Project Of Metallic Structure:, 1.6 Conventional Location Of Work, Using Template Of Boards Running Pointed Every 2, 00M - 2 Uses. Af_10/2018:, 1.7 Buried Water Reservoir, Capacity Of 15M3, In Reinforced Concrete With Pump Houses, Including Trap, Excavation, Backfilling And Transport And Removal Of Excavated Material (In Cacamba), Excluding Pipes, Pumps And Frames:, 1.8 Point Location For Topographic Reference. Af_10/2018:, 1.9 Construction Shed, In Resin Plywood Sheet, Including Sanitary Facilities And Furniture - Der-Mg Standard:, 1.10 Septic Tank For 1500 L/Day, Concrete, Installed (15 People), Including Material Outlet Excavated: 1.11 Septic Tank For 2250 L/Day, Installed (30 People), 1.12 Temporary Water Connection For Site, Including Hydrometer And Easel For Water Measuring - Main Entrance, In Galvanized Steel Dn 20Mm (1/2) - Dealership Standard :, 1.13 Tank For Gas Cylinder (Lpg), Including Masonry Seal With Esp. 14Cm, Plating With Mortar (Traco 1:3), Plastering With Mortar (Traco 1:2:8), Esp. 20Mm, Acrylic Paint In Two (2) Coats, Waterproofed Slab And Gate In 12 Wire Galvanized Mesh With Padlock, Exclusive Cylinders - Der-Mg Standard:, 2.1 Manual Excavation Of Trench For Baldrame Beam (Including Excavation For Placing Forms). Af_06/2017:, 2.2 Manual Drilling Of Auger Type Pile, Including Spacing, Excluding Frame, Structural Concrete, Transport And Removal Of Excavated Material:, 2.3 Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using Ca-60 Steel 5.0 Mm - Assembly. Af_06/2022:, 2.4 Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 8, 2.5 Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 10, 2.6 Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Beam Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022:, 2.7 Manufacture, Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, 4 Uses. Af_06/2017:, 2.8 Supply Of Structural Concrete, Pumped Machined, With Fck 20 Mpa, Including Placing, Densification And Finishing (Foundation):, 2.9 Piping Of The Bottom Of Trenches With Plate:, 2.10 Painting With Asphalt Emulsion, Two (2) Coats:, 3.1 Manufacturing, 3.2 Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-60 Steel Of 5, 3.3 Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 8, 3.4 Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using 10, 3.5 Ca-50 Steel
|