Construction Work – Urban Redevelopment, Lively Centers - Upgrading The State Capital Of Magdeburg, Renovation Of The Eskarpenmauer Maybachstrasse 1.Ba, Lot 3.02 - Tba 1.2 - Expanded Wall And Natural Stone Work. Lot 3.02 - Tba 1.2 - Advanced Masonry And Natural Stone Work Essential Services: - Clearing The Construction Site Stones Wall Remains Fences Rubble Rubbish 1,100 M2 - Deliver And Lay Out Road Construction Fleece - Be Areas Protective Measures 2,000 M2 - Makeshift M. Road Gravel D 10-15 Cm, Produce And Clear 600 M2 - Earth Retaining Dam, Produce, Maintain, 20 M - Pipeline Dn 600, Deliver And Install 100 M - Install Pump System, Convert And Clear 2 Pcs - Disposal Soil 465 T - Waste Dangerous Avv170503* Contaminated With Pollutants Dki Truck An Transp 1,025 T - Landfill/Recycling Mud, Sand, Water Contaminated 640 M3 - Remove Topsoil Promote Collect Load Transp. Truck 215 M3 - Soil Excavation, Manual Excavation 66 M3 - Loosen The Floor Of The Excavation Pit, Load Transp. Dispose Of Truck An For A Fee. An 400 M3 - Floor Installation, Embankment, Cunette 400 M3 - Create Dismantling Working Scaffold 4Wo Standing Scaffold Length-Oriented 1,200 M2 - Move Working Scaffold Standing Scaffold Length-Oriented 3Kn/M2 600 M2 - Produce, Assemble, Maintain Static Support Structure 6 Pcs - Consolidation 1,200 M2 - Clean Substrate Masonry High-Pressure Water Jets 1,200 M2 - Low-Pressure Cleaning Natural Stone 1,200 M2 - Remove Crusts 1,200 M2 - Sand Dry Blasting, Cleaning 1,200 M2 - Masonry Area, Clear Out Joints Up To 5 Cm 1,200 M2 - Replace Stones Brick Masonry 175 Pcs - Cyclopean Masonry, Add Individual Stones, Various Sizes 235 Pcs - Grouting The Wall Surface Quarry Stone, Mechanically 1,200 M2 - Add Cyclopean Masonry 15 M3 - Pressing Natural Stone Masonry - Up To 15 Kg / Drill Hole 925 St - Clean The Substrate Masonry High-Pressure Water Jets 270 M2 - Vertical Drainage Layer Mineral Gravel Sand D 50Cm 75 M3
|