Street-Lighting Maintenance Services – Public Lighting Development And Operation In Mór. Service Order, Which Includes Operation In An Esco Construction For 10 Years (120 Months) After Construction. Mór City Council Decided On The Energy-Saving Modernization Of The Active Elements (Lighting Fixtures) Of The Public Lighting Network In The Administrative Area Of The Settlement By Using Lighting Fixtures With Led Technology. The Aim Of The Intervention Is To Replace The Light Fixtures With More Modern And Energy-Saving Ones. In Order To Save Energy, A System Will Be Developed, The Luminous Flux Of Which Can Be Regulated. The Color Temperature Of The Fixtures To Be Installed Is 3000K. During The Intervention, No New Lamp Post Or Public Lighting Network Will Be Built, Primarily Lamp Body Replacements Will Take Place On Existing Lamp Arms, But At The Same Time, Lamp Body Compaction And Lamp Arm Replacements Will Also Take Place. The Task Covers Exclusively The Implementation Of The Modernization Of The Public Lighting Network With Light Fixture Replacements And Minimal Additions, The Establishment Of A New Public Lighting Network Is Not The Subject Of The Assignment. The Intervention Takes Place In The Administrative Area Of Mór City. The Public Lighting Network In Some Of The Inner City Areas Has Underground Cables, While In The Rest Of The Settlement There Are Insulated Free-Wire Aerial Cable Networks And Bare Free-Wire Networks. The Largest Number Of Light Fixtures With Compact Fluorescent Tubes And Sodium Lamps Will Be Replaced. In The Case Of Existing Led Luminaires In The Settlement, Several Interventions Are Also Carried Out, Some Are Moved, Some Remain In Their Existing Location And Are Dimmed And Programmed, Some Whose Driver Is Not Suitable For Dimming, And An Impressive Replacement Is Carried Out In These. There Are Some Led Lights In The Settlement, Which Were Installed During The Investments Of Recent Years And Do Not Fit Into The New System, They Will Be Dismantled And Handed Over To The Municipality. The Traditional Decorative Lighting Fixtures And Spotlights In The Settlement Will Also Be Replaced With New Led Technology Fixtures And Spotlights. In The Case Of Candelabras, Light Fixture Replacements Can Be Carried Out From A Vehicle With A Basket Due To The Height Of The Existing Lamp Posts And The Extension Of The Light Point, Ladders Cannot Be Used. Construction Must Be Carried Out In Such A Way That It Does Not Interfere With The Safety Of Road Users. Space Must Be Provided For Those Traveling By Car. Traffic Restriction And Traffic Diversion Warning Signs Must Be Placed During Works Near The Public Road. The Contractor Is Also Responsible For Preparing The Complete Handover Documentation. This Must Include, Among Other Things, A Statement From The Contractor, A Statement From The Responsible Technical Manager, Contact Protection Measurement Protocols, Lighting Measurement Protocols, Network Inventories, A Public Lighting Change Report, And An Implementation Plan. Main Quantities: Demolition Of A Lamp Body Or Spotlight From A Pole, Pole Arm, Or Support Structure Using A Basket Vehicle: 1,865 Pieces Building A Lamp Body On A Pole Or Pole Arm Using A Basket Vehicle: 1,870
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78921031
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.