The Subject Of The Order Is The Task Of Preparing Design Documentation And Construction Works Consisting In The Construction Of Municipal Road No. 791173P - Ul. Topolowa In Gorzyce Wielkie And Ul. Leśna In Topola Mała On A 1,681 M Long Section. Currently, On Part Of The Section, The Road Has An Aggregate Surface, And On The Remaining Section It Is A Dirt Road. The Planned Scope Of Construction Will Include The Construction Of A Bituminous Surface With A Width Of 5.0 - 5.50 M On A Full Substructure Structure, Along With Drainage To Existing Ditches And Newly Designed Ones. The Planned Construction Will Include Concrete Road Ramps To Developed Plots, And The Remaining Part Will Include The Construction Of Crushed Aggregate Roadsides On Both Sides Along The Entire Road Section. It Is Also Planned To Make Connections To Side Roads. As Part Of The Task, It Will Be Necessary To Cut Down Trees And Bushes And Connect The Street To The Provincial Road No. 445. Odolanowska In Topola Mała. The Scope Of The Order Included In This Functional And Utility Program Includes: − Preparation Of Construction, Technical And Executive Designs (Separately For Each Industry) And Obtaining Opinions, Consents, Arrangements And Permits Resulting From The Regulations, As Well As Obtaining A Decision Enabling The Execution Of Construction Works; - Projects Related To Collisions With Existing Networks (In Accordance With Industry Arrangements To Be Requested From Individual Network Operators) − Preparation Of Technical Specifications For The Execution And Acceptance Of Construction Works; − Surveying Services; − Geological And Engineering Services; − Development And Approval Of Traffic Organization Designs For The Duration Of The Works And Permanent Traffic Organization; − Execution Of Construction Works Based On The Above Designs; − Carrying Out The Required Tests And Examinations And Preparing Documents Related To Putting The Task Into Operation; − Obtaining An Occupancy Permit Decision On Behalf Of The Ordering Party; − Fees For All External Inspections, Examinations, Tests, Etc.; − Authors Supervision Of The Designer; − Post-Construction Surveying Inventory; − As-Built Design Documentation. Section Length: 1,681.00 Mb = 1.681 Km. The Detailed Scope And Type Of Work To Be Performed Under The Subject Of The Order Is Presented In The Functional And Utility Program Constituting An Annex To This Swz. The Contractor Is Responsible For Waste Generated In The Course Of Its Own Works And For Proper Way Of Dealing With Them, In Accordance With The Provisions Of The Act Of December 14, 2012. On Waste (Journal Of Laws Of 2023, Item 1587, As Amended) And The Act Of September 13, 1996 On Maintaining Cleanliness And Order In Municipalities (Journal Of Laws Of 2024, Item 399). The Removal Of Construction Waste Takes Place At The Expense Of The Contractor. Note! All Indications Of Trademarks, Patents Or Origin, Source Or Specific Process Used In The Order Documents That Characterize The Products Or Services Provided By A Specific Contractor Are Provided As Examples And Specify Only The Minimum, Expected Quality Parameters And Required Standard. If The Above-Mentioned Items Are Used In The Description Of The Subject Of The Order Or Design Documentation. Indications Should Be Treated As The Designers Proposal And Are Accompanied By The Words Or Equivalent. The Ordering Party Allows The Use Of Equivalent Materials And Devices To Those Designed In Accordance With The Same Or Better Technical, Technological And Quality Standards. In Addition, Replacement Materials Or Devices Accepted For Valuation Should Fulfill The Function They Are Intended To Serve; They Should Be Compatible With Other Devices So That The Set Of Devices Produces The Intended Effect; Cannot Influence The Change Of The Type And Scope Of Construction Works. In A Situation Where The Technical Documentation Indicates Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 - 3 Of The Public Procurement Law, The Contracting Authority Allows Solutions Equivalent To Those Described, And Such A Reference Is Accompanied By The Words Or Equivalent. The Ordering Party Allows The Use Of Equivalent Solutions - Provided That They Guarantee The Implementation Of The Works In Accordance With The Swz And Allow For Obtaining Parameters No Worse Than Those Provided For In The Technical Documentation, While The Contractor Is Obliged To Prove In The Offer, In Particular By Means Of Evidence Referred To In Art. 104-107 Of The Public Procurement Law, That The Proposed Solutions Equally Meet The Requirements Specified In The Description Of The Subject Of The Contract. The Contractor Bears All Costs Related To The Use Of Equivalent Solutions. The Ordering Party Allows The Submission Of Equivalent Offers
|