Construction Work – Master Builder’S Work, Total Reconstruction Of Tschamut-Dieni, Sontga Brida. The Section Of The Route Under Consideration Connects The Tschamut-Selva And Dieni Train Stations And Begins At Approx. Km 84109 And Thus Shortly Before The End Of The Rack, Which Is Located At Km 84,185. The Track Then Runs Parallel To The Oberalpstrasse In The Direction Of Dieni, Before It Moves Away From The Road At Km 84425, Branches Off In A Left Curve Through The Rock Cut Between Km 84608 And 84704 And Crosses Under The Natural Stone Arch Bridge At Km 84660. After A Short Intermediate Straight, The Track Flows Into Dieni Station After A Right Curve At Approx. Km 84942. The Project Perimeter Ends Shortly Before That At Km 84,926. The Railway Line In The Section Under Consideration In Its Current Design Does Not Meet The Requirements And Specifications Of The Current Standards And Therefore A Total Reconstruction Is Taking Place.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78863935
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.