Work Detail
Building Construction Work – 403_M0-Lüftung. Kgr 430 - Rlt Systems 1 Piece Rlt Central Device With Hydraulic Supply Unit, Approx. 14,000 M³/H 1 Piece Rlt Central Device With Hydraulic Supply Unit, Approx. 29,000 M³/H 1 Piece Rlt Central Device With Hydraulic Supply Unit, Approx. 3,000 M³/H 1 Piece Rlt Central Unit, Approx. 24,000 M³/H 1 Piece Ec Radial Tube Fan With Noise-Damped Housing, Approx. 580 M³/H 1 Piece Ventilation Box Centrifugal Fan, Approx. 3,100 M³/H 1 Piece Radial -Tube Fan, Atex, Approx. 310 M³/H 1 Piece Duct Radial Fan, Approx. 4,620 M³/H 4,414 M² Air Duct System Including Fittings, Atc3 593 M² Air Duct System Including Fittings, Atc4 707 M Spiral-Seam Pipe 899 Pieces. Spiral-Seam Pipe Fittings 315 M Air Line, Flexible 1 Pc. Humidifier, Approx. 16 Kg/H 49 Pcs. Constant Volume Flow Controller, Around 20 Pcs. Constant Volume Flow Controller, Square 25 Pcs. Variable Volume Flow Controller, Square 62 Pcs. Silencer, Square 66 Pcs. Silencer, Around 72 Pieces Bsk, Square 32 Pieces Bsk, Around 147 Pieces Slot Diffusers
Other Detail
View Original Notice/Document
Download
View Notice Now...
Fill Detail for Getting Instant Access
Instant Access