1. The Subject Of The Order Is The Construction Of A New Sports Hall In Lębork For Primary School No. 1 At Ul. Wojska Polskiego 10 And Obtaining - On Behalf Of The Ordering Party - A Decision On The Use Permit (Plot No. 412/2, Registration District 7 Lębork). The Facility Is A One- And Two-Story Building, Without A Basement, In A Rectangular Shape With A Gable-Arched Roof.2. The Scope Of Works Includes: 2.1. Construction Of A New Hall Building With Social, Cloakroom And Sports Facilities, 2.2. Construction Of A Sanitary Sewage Connection, 2.3. Construction Of A Water Supply Connection, 2.4. Execution Of Power Connection, 2.5. Construction Of A Ramp For Disabled People, 2.6. Construction Of New Sidewalks, Stairs And A Strip Next To The Building, 2.7. Execution Of Domestic Hot Water Installation, 2.8. Construction Of Water Supply System, Including Hydrant And Sewage System, 2.9. Execution Of Central Heating Installation, 2.10. Execution Of Electrical Installation (Lighting, Sockets, Evacuation) Along With Accessories, 2.11. Earthing, Lightning Protection And Equalizing Installations2.12. Protection Against Electric Shock,2.13. Execution Of Monitoring Installation In Terms Of Wiring2.14. Removing Interference With The Existing Heating Connection On The Plot 2.15. Land Development3. There Are Two Entrances To The Room: - Directly From The Connector Leading To The School - Used As The Main Entrance To The Room, - An External Entrance Used As An Emergency Exit. On The Ground Floor There Are 1 Cloakroom And Sanitary Rooms For Childrens Classes. Where There Are Lockers For Changing Into Sports Clothes. Additionally, On The Ground Floor There Is An Equipment Warehouse, A Trainers Room With Social Facilities, A Technical Room, A Utility Room For Womens Toilets And A Toilet, And A Mens Toilet. On The First Floor There Are Three Cloakroom And Sanitary Rooms And A Corrective Exercise Room.4. Technical Assumptions4.1. Height Of Rooms (Sports Hall 8.73 M, Other Rooms 3.05 M),4.2. The Following Are Designed On The Floors: A/ In The Room There Is A Flexible Sports Floor With A Thick Pvc Carpet. Min. 4 Mm,B/ In The Exercise Room, A Point-Elastic Sports Floor With A Rolled Multi-Layer Pvc Sports Flooring With A Total Thickness Of Min. 12.5 Mmc/ In The Cloakrooms, Communication On The Ground Floor And First Floor And In The Equipment Warehouse, Homogeneous Pvc Flooring, Thickness. 2.2 Mm, D/ Sanitary Facilities, Washrooms And Toilets, Anti-Slip Ceramic Tiles, E/ Anti-Slip Ceramic Tiles In The Connector, F/ Stairs, Anti-Slip Ceramic Stair Tiles, 4.3. Walls In Hygiene Rooms, Tiles Were Designed To Cover The Entire Height Of The Room, 4.4. Cement And Lime Plaster With Gypsum Plaster On The Walls, 4.5. On Communication Walls And Cloakrooms, Resin Plaster (Instead Of Painting) Up To A Height Of 2.0 M4.6. Gable Walls In The Room Up To A Height Of 3.0 M, Impact-Resistant Polyurethane Acoustic Boards, Above Painted With Silicate Paint, 4.7. Electrical Installation Protected Against Access By Persons, 4.8. Inside Temperature: Room Above 16° C, Others Above 20° C,4.9. Toilets With Access To Hot And Cold Water Were Designed, 4.10. All Windows Are Designed From Pvc Profiles, Fixed, Casement And Tilt-And-Turn, 4.11. Aluminum Entrance Doors4.12. Mechanical And Gravity Ventilation Are Provided, 4.13. Lighting Meeting Standard Requirements, 4.14. Mechanical Ventilation In Sanitary Facilities With A Built-In Fan And Switchable Lighting, – Roof Layout: Two-Slope And One-Slope, 4.15. The Direction Of The Main Ridge Parallel To The Front Elevation.5. List Of Areas Technical Data: – Building Area – 992.00 M², – Building Volume – 7,668.16 M³, – Building Height – 8.94 M, Allowable 9.00 M – Arched Roof, Flat On A Connector, – Usable Area – 1,071.61 M²6. The Scope Of The Order Excludes The Supply Of A Mop Hanger (8.10), A Professional Two-Bucket Cleaning Trolley (8.11), A Climbing Wall (8.26), A Cabinet For Sports Equipment (8.27), A Shelf For Sports Equipment (8.28), And A Metal Cabinet For Cleaning Products ( 8.29), Desk (8.33), Upholstered Armchair (8.34), Computer (8.35), Multifunction Device (8.36), Microwave Oven (8.38), Metal Shelf For Devices (8.39), Shelf For Books, Binders, Documents (8.40), Chairs (8.41), Sofas (8.42), Benches (8.43), Wall Hanger (8.44), Magnetic Board (8.45) Referred To In Point 8 Of The Technical Design For The Construction Industry And In Point 8. Architectural And Construction Design.
|