Architectural, Construction, Engineering And Inspection Services – 3.41.1.1. Renovatie Atomium : Hvac. This Contract Concerns A Complete Project Authorship Mission For Special Techniques, Architecture And Additional Services. Throughout The Duration Of The Contract, The Successful Bidder Provides The Services Necessary For The Completion Of The Project, And In Particular - The Project Authors Services And Additional Services, As Described Below, Including Stability And Reliability Studies. Special Techniques; - Gro Monitoring; I.E. The Imputation Of The Project In The Gro Files (Summary And Checklist) As Described At The Offer Stage, Then At Each Phase Of The Project Included In Gro (Preliminary Project, Final Project = Permit File, Award, Provisional Acceptance , Final Acceptance), As Well As The Provision Of Studies And Documents Relating Thereto. - Services Relating To The Regulations On Energy Performance And The Indoor Climate Of Buildings (Peb) In Force In The Brussels-Capital Region, Including: The Appointment Of An Approved Peb Advisor, The Designation Of A Peb Heating Advisor, The Establishment Of A Peb Proposal, A Peb Technical File, The Notification Of The Start Of The Work To Bruxelles-Environnement, And The Establishment Of The Peb Declaration. Finally, The Acceptance At The End Of The Construction Site Of The Heating Installation; - The Coordination Of Project Author Services, Additional Services And Services Carried Out By The Project Owner And His Agents; - Close Consultation With Partner Bodies (Users, Owner, Etc.) And Designated Experts (Soil Experts, Etc.) Active Within The Framework Of The Project. The Tenderers Attention Is Drawn To The Fact That This Imposition Will Involve The Organization And Participation In Numerous Meetings And Perfect Bilingualism. The Plurality Of Partners Will Also Require The Service Provider To Assume The Role Of Facilitator, Assisting Participants In Constructing Certain Agreements. - In Collaboration With The Soil Expert(S), The Service Provider Will Seek The Best Solution, In Technical And Financial Terms, For The Management Of Polluted Land. This Coordination, To Be Carried Out Within The Study Area, May Involve Several Adaptations Of The Project. - Participation In All Meetings To Which The Successful Tenderer Is Invited By The Mo, Including The Preparation Of Reports Within 2 Working Days In The Language Of His Offer, Unless Otherwise Stated In These Specifications; - On-Site Visits Ordered By The Mo; - Permanent Control Of Compliance With The Planning And Budgets Imposed By The Mo. - Possible Presentations Of The Project To Local Residents, Which Involves Active Participation In All Or Part Of The Information Sessions Organized, The Evaluation Of Possible Questions Or Suggestions Submitted On This Occasion, If Necessary, The Critical Analysis Of Certain Inputs Of The Process (Maintaining The Overall Coherence Of The Site); - Establishing A Deconstruction Inventory
|