Underground Work Other Than Tunnels, Shafts And Subways – Civil Engineering And Outdoor Facilities Gw Lyoner Str. The Verkehrsgesellschaft Frankfurt Am Main Mbh Is Planning To Use New Vehicles In The Light Rail Network. The Performance Of The Existing Traction Power Supply Systems Is Sometimes Inadequate With Regard To Future Operating Conditions. In Addition, The Nominal Contact Line Voltage Is To Be Increased To Dc 750V. Various Upgrade Measures Are Necessary For This, Including The Replacement Of The Mobile Rectifier Plant On Lyoner Straße In Frankfurt A.M. With An Existing Gw Container With The Latest Technology. The Services Include: • Setting Up The Construction Site / Preparatory Work • Steel And Concrete Work To Produce The Base Plate And The Fencing For The Rectifier Plant • Earthworks • Fencing Of The Construction Site • Breaking Up And Creating The Surfaces Including The Green Areas • Paving Work To Create The Access Road • Restoration The Outdoor Area And Planting. • The Transport Of Foundations In The Form Of L And T Stones From The Römerhöfe To Lyoner Straße. \/Confidential Attachments Are: Route Plan, Schedule, Implementation Planning And Statics
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78758389
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.