Other Building Completion Work – Ngh Fürreuthweg 3.140 Baufeinreinigung_Neubau Primary School After-School Care. Compilation Of Care Instructions For Interim Building Cleaning (Also Cleaning Several Times): - Approx. 12,000 M² Floor Areas, Interior, Approx. 12,000 M² Floor Area, With Protective Cover - Approx M² Wall Surfaces, With Tiles, Construction Cleaning (Also Cleaning Several Times): - Approx. 18,000 M² Floor Areas, Lino, Parquet, Floor Coating Etc. With Skirting Boards - Approx. 540 Steps Of Natural Stone - Approx. 2,300 M² Ceiling Areas, Gk/Gk Acoustics Etc. - Approx. 4,000 M² Of Wall Surfaces, Exposed Concrete, Painted, Tiles Etc. - Approx. 250 Pieces Of Interior Door. Single, Steel Frames With Steel / Wooden Leaves + Approx. 5 Pieces Double. - Approx. 18 Pieces Of Interior Door. Single, Steel Pipe/Fixed Comparison, Approx. 1.8-6.8X2.7M + Approx. 30 Pieces Double. - Approx. 6 Pieces Of All-Glass Walls, Approx. 1.78X2.38-12.00M - 2 Pieces Of Mobile Partition Walls, 7.95-10X2.65M - Approx. 324 Pieces Of Wardrobes, 1-3 Compartments, 35-80X60x170cm - Approx. 2 Cupboards, Room-High, 360-720X60x200-300Cm - Approx. 8 Tea Kitchens, Room-High, Approx. 300-550X60x300cm - Approx. 770 M Window Sills - Approx. 24 Toilet Partition Systems, 1-4 Doors + Approx. 200 Pcs. Sanitary Items - Approx. 6 Pcs. Kitchen Facilities, Room Size Approx. 7-30 M² - Approx. 135 M Steel Railing With Wooden Handrail, Staircase - Approx. 2 Pcs. Technical Equipment Technical Rooms, Room Size Approx. 100-255 M² - Other, Such As 2 Elevator Cabins, Cleanliness, Radiators, Cables, Etc. Outdoor Area: - 73 Window Elements With Fixed Glazing / Tilt-And-Turn Sashes, Wood-Aluminium, A+I, Approx. 3-30.5 X 2.1-2.8 M, 2 Pieces Approx. 1.5X6.1 M With Approx. 5 External Doors, Single / Double. - 1 Piece Of Stepped Saddle Light Strip, 10°, A+I, 8.2X8.05 M - Approx. 2,100 M² Floor Areas, Outdoor Space, Roof, Lawn Etc. Fine Cleaning (Single Cleaning): - Approx. 8,700 M² Floor Areas + Approx. 282 Steps, Indoor Area - Approx. 5,500 M² Of Floor Space, Outdoor Area Including Building Rubble Removal. Cleaning Work, Approx. 60 Pieces. Positioning Containers, 7 M³ + Approx. 85 T Disposal Of Various Waste
|