The Subject Of The Order Is: Expansion Of The Entrance To The Main Building Of Tomaszowski Center Zdrowia Sp. Z O.O. - Design And Build The Detailed Description Of The Subject Of The Order Is Included In The Functional And Utility Program Included In Annex No. 1 To The Swz, I.E. Implementation In Stages: 2) The Scope Of The Subject Of The Order Includes, Among Others: Stage I: In The Scope Of Design: - Carrying Out Geotechnical Tests Of The Ground, - Purchasing A Basic Map And A Map For Design Purposes, - Preparing An Architectural Concept Including: Land Development Design, Projections, Sections And Elevations, Agreeing It With The Ordering Party In Terms Of His Expectations And, Above All, Compliance With The Provisions Of The Contract And The Functional Program - Utility, (The Document Requires Approval By The Ordering Party), - Development Of A Construction Design: Architectural And Construction Design And Land Development In Accordance With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, And Functional And Utility Program (Journal Of Laws U. 2013, No. 0, Item 1129) And Also In Accordance With The Ordering Partys Recommendations (The Document Requires Approval By The Ordering Party) - In 4 Copies In Paper Version And 1 Copy In Electronic Version On An Electronic Medium Such As A Pendrive, - Obtaining All Required Opinions , Arrangements With A Fire Expert And A Sanitary And Hygienic Expert, - Obtaining A Public Purpose Decision On Behalf Of The Ordering Party, - Obtaining A Final Building Permit Decision On Behalf Of The Ordering Party, - Developing Multi-Discipline Technical Designs (Construction Design, Electrical Design) In Accordance With With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2013, No. 0, Item 1129) And Also In Accordance With Recommendations Of The Ordering Party (The Document Requires Approval By The Ordering Party) - In 4 Copies In A Paper Version And 1 Copy In An Electronic Version On An Electronic Medium Such As A Pendrive, - Preparation Of An Offer Cost Estimate (The Document Requires Approval By The Ordering Party) In 2 Copies In A Paper Version And In Electronically In Pdf Format And Standard On An Electronic Medium Such As A Pendrive, Stage Ii: In The Scope Of Build: 1) In The Internal Part Of The Building, The Following Should Be Taken Into Account: - Dismantling The Finishing Layer Of The Floor, - Dismantling Ceramic Wall Tiles, - Dismantling The Existing Vestibule Door Joinery, - Replacing The Radiator Wall, - Installation Of Additional New Layers Of Flooring With A Layer Of Stoneware In The Newly Designed Hall, - Demolition Of Stairs In The Place Of The Planned Ramp, - Construction Of An Internal Ramp For The Disabled With Reinforced Concrete Walls And Handrails Securing The Ramp In The Designed Hall, - Supplementing Wall Fragments With Plaster Plastering, Leveling Defects On The Remaining Part Of The Walls In The Hall Design, - Painting The Walls And Ceiling Twice With Washable, Dirt-Resistant Paint, - Making New Wall Coverings With Large-Format Stoneware (60 Cm X 120 Cm), - Replacing The Lighting Fixtures With Energy-Saving Led Ones In The Area Covered By The Design: Hall And Vestibule, - Installation Of Glazed Doors In An Aluminum Frame: A) External Two-Door - Vestibule, B) Automatic Internal Two-Door Doors In The Hall, - Installation Of Led Lighting In The Designed Vestibule And The Renovated Hall, - Installation Of A New Internal System Wiper, - Delivery And Installation Of An Elevator For Disabled People In Accordance With The Attached Technical Card, 2) In The External Part Of The Building, The Following Should Be Taken Into Account: - Demolition Of The Existing External Stairs To The Main Entrance To The Building, - Demolition Of The Roof Over The Above-Mentioned External Stairs, - Construction Of New Designed External Stairs , - Construction Of A New Designed Vestibule And A Roof Over The Entrance, - Construction Of Foundation Walls With A Floor, Aluminum Glass Facades And A Roof Over The Newly Designed Vestibule, - Reconstruction Of A Section Of The Sidewalk With New Red Holland-Type Stones, Adapted To The Needs Of Disabled And Blind People, - Installation Of Steel Handrails, - Installation Of Outdoor Led Lighting, 3) After The Construction Of The Facility, It Is Necessary To Prepare And Obtain: - Approvals And Permits For The Operation Of The Crane From The Office Of Technical Inspection, - Preparation Of An As-Built Inventory In A Paper Version (3 Copies) And Electronic. - Preparation Of The Construction Completion Notification To Pinb (Poviat Construction Supervision Inspector) Along With Obtaining The Occupancy Permit Decision On Behalf Of The Ordering Party - As Well As Providing The Ordering Party With Service And Maintenance Services Of The Delivered Crane During The Warranty Period. Under This Order, The Contractor Must Also Take Into Account The Work And Costs Necessary To Complete The Task, Including: 1) Providing, Implementing And Maintaining Signage For The Duration Of Construction, 2) Carrying Out Measurement/Surveying Works In The Scope Of Expansion, 3) Obtaining All Necessary Documents Confirming The Correctness Of The Works Performed; 4) Arrangement, Maintenance And Security Of The Construction Site And Construction Facilities; 5) Costs Of Supplying And Using Energy, Water And Other Necessary Media For Technological Needs, Facilities And The Construction Site; 6) Maintaining The Proper Order Of Access Roads To The Construction Site, With Particular Emphasis On Maintaining Cleanliness In Sections Related To Construction Transport (Including Preventing Mud From Being Carried Away On The Wheels Of Cars Leaving The Construction Site); 7) Ensuring Supervision As Well As Appropriate Occupational Health And Safety Conditions; 8) Tidying Up The Construction Site After Completion Of The Works And Handing Over The Tidied Area To The Ordering Party No Later Than On The Day Of Acceptance; Removal From The Construction Site At The Contractors Expense, With Particular Observance Of The Provisions Of The Act On Waste, Demolition Materials Unsuitable For Use And Excess Earth Masses. The Detailed Scope Of Work Is Included In The Functional And Utility Program
|