3.1. The Subject Of The Order Is The Intermediate Renovation Of The Training Ship M/T Franek. Shipowner: Maritime School Complex In Darłowo. 3.2. Technical Data: Brt 157 Nrt 47 L 29.06 M Lc 32.5 M B 6.70 M H 3.80 M T 3.01 M Main Engine - Buckau Wolf, Magdeburg 1950, S.Sp,4S,N, R8dv136 , 221 Kw3.3. Renovation Specifications:3.3.1. List Of Work To Be Performed In The Deck Department1. Unit Docking And Launching2. Stay At The Slip (Expected Stay At The Dock: 16 Days)3. Pressure Washing Of The Hull 200M2 4. Hull Maintenance Part Underwater - Cleaning And Grinding 200 M2 - Painting With Primer Paint + Paint 2 Times 200 M2 - Painting With Antifouling Paint + Paint 1 Time 200 M2 - Hand Painting Kits 5. Replacing Zinc 11 Kg Pcs. 4 6. Disassembly And Assembly Of Kingstone Nets Pcs. 2 7 Inspection And Pressure Tests Of Bottom Valves, 4 Pcs. 8. Replacement Of The Upper Plating Of The Gray Water Tank. No. 25 To 31 Disassembly Of Equipment, Walls In Bathrooms And Boatswains Rooms Dismantling Of Formwork On Pb Shoveling Concrete With Tiles 8 M2 Replacing The Tank Plating Sheet 18 M2 Cleaning Floors, Bottom Plating And Exposed Parts Of Sides Regeneration Of Floors In The Tank Paint Conservation Inside The Tank, Floors And Exposed Parts Sides (66 M2) Replacement Of The Echosounder Oscillator Housing (Housing Supplied By The Shipowner) Installation Of The Tank Emptying System From Suction Cups To The Pump Installation Of Drains From Bathrooms And Washbasins Installation Of New Tank Plating 6 Mm Ships Sheet Metal And Welding Installation Of Lipb Tank Venting Preparation For Leak Test And Water Tightness Test (Under Pressure) Maintenance Of The Tank Shell Outside Final Works - Screed Of The Bathroom Floor - Approximately 8 M2 Installation Of Walls And Formwork - Waterproof Board Approximately 25 M2 Gluing Tiles - Approximately 40 M2 Installation Of Removed Equipment9. Fire Protection Of The Tank Plating Replacement Area10. Disposal Of Dismantled Elements3.3.2. List Of Works To Be Performed In The Machinery Department1. Electrical Installation Mega-Certification2. Replacement Of Damaged Sg Cooling Water Temperature Thermometers, 4 Pcs. 3. Lapping Of Intake Valves, 8 Pcs., And Exhaust Valves, 84 Pcs. Lapping Of Starting Valves, 85 Pcs. Adjusting The Injector Pressure, Pcs. 86. Springing The Main Engines Crankshaft 7. Regeneration Of The Suspended Water Pumps For Cooling The Main Engine, Pcs. 28. Inspection And Adjustment Of The Fuel Pump On The Sw 4009 Engine. Inspection Of The Steering Gear And Replacement Of Seals10. Windlass Inspection And Tests11. Update Of The Engine Room Plan And Approval From Prs In The Scope Of: Installation Of A Fire-Fighting Water Pump. Including Connection To The Installation Installation Of A New Compressor System With The Following Parameters: Capacity 260L/Min, Max Pressure 30 Bar, Engine Power 4Kw, Voltage 400V Replacement Of The Reserve (Parking) Unit12. Purchase And Installation Of A New Fire Protection Water Pump With Connection To The Installation 13. Dismantling Of The Old Combustion Compressor System 14. Purchase And Installation Of A Compressor System According To Approved Prs Documentation Together With An Electrical Switchboard15. Approval Of Compressed Air Safety Valves, Pcs. 716. Replacement Of Central Heating Pipes ¾ - 10 M, ½ - 10 M17. Installation Of Emergency Switches For Pumps, 4 Pcs - According To Documentation18. Insulation Of A Cold Store For Provisions 8 M219. Drying Of Bilge Space For Prs3.4 Inspection. The Contractor Is Responsible For The Quality And Compliance Of Renovation Works With The Specifications. The Components Of The Subject Of The Contract Also Include All Works And Services Accompanying The Implementation Of Renovation Works Referred To In The Description Of The Subject Of The Contract, In Particular: Preparatory And Cleaning Works, Securing The Place Of Work. 3.5. Before Signing The Contract, The Contractor Is Obliged To Submit To The Ordering Party A List Of Works Together With The Calculation Of Unit Prices. If The Description Of The Subject Of The Order Includes Trademarks, Patents Or The Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, An Indication Such Shall Be Accompanied By The Words Or Equivalent. The Ordering Party Allows Equivalent Solutions, Not Worse Than Those Mentioned In The Description Of The Subject Of The Order. Any Indication Of Trademarks, Patents Or Origin, Source Or Specific Process In The Description Of The Subject Of The Order Is Only Intended To Specify The Quality And Technological Expectations Of The Ordering Party. The Ordering Party Allows Equivalent Solutions With The Same Technological, Performance And Functional Level In Accordance With The Assumed Description Of The Subject Of The Order. All Possible Names And Trade Brands Of Systems, Devices And Equipment Included In The Swz Were Used To Specify The Quality And Technological Expectations Of The Ordering Party. The Ordering Party Informs That It Allows The Submission Of Offers In Which Individual Devices Or Materials May Be Replaced With Equivalent Devices Or Materials. The Concept Of Equivalent Materials And Devices Should Be Understood As Materials Guaranteeing The Implementation Of Works In Accordance With The Swz Assumptions And Ensuring Technical Parameters Not Worse Than Those Assumed In The Swz Documentation. Equivalent Products And Devices Must Be Authorized For Trading And Use In Accordance With Applicable Law.
|