1. Scope Of The Order: Includes The Preparation Of A Construction And Executive Design Together With Tender Materials For The Task: Reconstruction Of District Road No. 1183G - On The Section From The Town Of Redkowice To The Town Of Nowa Wieś Lęborska From Km 9+400 To 16+300 - District Road No. 1183G With A Length Of 6,900 Km From Km 9+400 To Km 16+300 (Excluding The Railway Crossing) Divided Into Full-Time Positions: - Stage I, Completion By November 15, 2024, Worth 50% Of The Order (But Not More Than Pln 100,000, Pln 00), - Stage Ii Implementation Until September 30, 2025 (Scored), October 15, 2025 (Final) Remaining Order Value. The Existing Dp 1183G Surface Is In Poor Technical Condition With Numerous Cracks, Defects, Potholes And Broken Edges. It Runs Through Agricultural And Forest Areas, Including Redkowice, Czarnówko And Nowa Wieś Lęborska.2. Design Assumptions: On This Section, District Road No. 1183G Runs Through An Area Developed With Single-Family Buildings And Through Undeveloped Areas. The Existing Road Is Narrow, Has Few Sidewalks And Some Exits. The Reconstruction Of The Road Involves Strengthening The Road Structure, Widening It, Building A Bicycle Path/Pedestrian-Bicycle Route, Renovating The Sidewalk And Culverts Under The Exits, Installing Embedded Resistors On Internal Curves, Building A Sidewalk And Hardened Shoulders, Building Hardened Exits Within The Road Right-Of-Way And Rebuilding The Existing Ones. Exits And Intersections. Horizontal And Vertical Markings Will Be Made. Management Of Rainwater In The Existing Road Lane Into Evaporation Ditches. Design Assumptions:• Z-Class Road, Kr 3-4 Category;• Road Width: In Built-Up Areas Min. 5.5 M, On Curves 6.0 M, Outside Built-Up Areas Min. 6 M;• Construction Of A Bicycle Path Or Pedestrian And Bicycle Route• Hardened Shoulder 0.75 M Wide; • Securing The Edges Of The Road On Curves And Exits With Stoppers Or Drive-On Curbs; • Surface Water Drainage To Existing Evaporation Ditches; • Construction Of Roadsides From An Optimal Mixture, Width 0.75/1.00 M; • Construction Of Hardened Exits Within The Road Lane; • Construction Vertical And Horizontal Markings: Thick-Layer Structural;• Cleaning Of Existing Ditches And Slope Profiling;• Construction Of A Service Channel Or Obtaining Exemption From The Obligation To Locate A Service Channel;• Renovation Of Existing Culverts;• Implementation Of Industry Arrangements;• Indication Of Trees For Felling.3. The Order Includes: 3.1 Execution Of A Construction Design, Including: A Land Development Design, An Architectural And Construction Design And A Technical Design With A Longitudinal Section, Cross-Sections And Geometry Of Arches, Along With Specifications For The Execution Of Works, Bill Of Quantities And Investors Cost Estimate, As Well As Any Other Necessary Accompanying Studies And Arrangements. The Scope Of The Order For Stage I On The Section Of Dp 1183G From Km 15+305 To 16+300 Includes: 1) Obtaining A Current Map For Design Purposes Of Dp 1183G From Km 9+400 To Km 16+300. Map Requirements: - The Base Should Be Admitted To The State Geodetic And Cartographic Resources At The County Office In Lębork - Scale 1:500.2. Preparation Of A Complete And Detailed Inventory Of Underground And Above-Ground Utilities And Forest Entrances. The Inventory Should Be Agreed With The Road Manager Regarding The Location Of External Devices That Have Not Yet Been Implemented In The Field Before Preparing The Map. 3. Preparation Of A Detailed Inventory Of Surfaces, Exits, Culverts, And Trees To Be Cut Down4. Submitting An Application On Behalf Of The Ordering Party For Exemption From The Obligation To Locate A Service Duct. In Case Of Refusal, Implementation Of A Technological Channel Design.5. Preparation Of Construction And Executive Design - 3 Copies 6. Preparation Of Detailed Technical Specifications For The Execution And Acceptance Of Works - 2 Copies7. Preparation Of The Bill Of Quantities - 2 Copies 8. Preparation Of The Offer Cost Estimate In The Sst System - 2 Copies 9. Preparation Of An Investors Cost Estimate In The Sst System, Divided Into Ranges - 2 Copies10. Obtaining Opinions, Arrangements, Permits And Other Documents Required To Be Attached Pursuant To The Provisions Of Separate Acts Or Copies Of These Opinions, Arrangements, Permits And Other Documents.11. Preparation Of Materials For Reporting Construction Works Dp 1183G From Km 15+305 To 16+300, Including: - Graphic Attachment (Sketches, Drawings) - Current Map For Design Purposes With Land Development On A Scale Of 1:500 With The Location Of The Reported Construction Works - Design Development Of Plots Or Land Carried Out By A Designer With Appropriate Construction Qualifications, In The Cases Referred To In Art. 30 Section 3 And Section 4 Of The Construction Law (Act Of July 7, 1994, Journal Of Laws Of 2019, Item 1186, As Amended) - Permits, Arrangements And Opinions Required By Separate Regulations, Including Arrangements With Network Operators.12. Preparation Of 1 Copy Of The Entire Project In Numerical Form On Cds (Additionally, The Drawing Part Must Be Provided In A Form Compatible With Autocad). 13. Carrying Out Public Consultations - Min. 2 Meetings In The Nowa Wieś Lęborska Commune (Concept, Final Land Development Plan)14. Execution Of The Permanent Traffic Organization Project - 3 Copies. The Scope Of The Order For Stage Ii On The Dp 1183G Section From 9+400 Km To 15+305 Includes: 1. Preparation Of A Complete And Detailed Inventory Of Underground And Above-Ground Utilities And Forest Entrances. The Inventory Should Be Agreed With The Road Manager Regarding The Location Of External Devices That Have Not Yet Been Implemented In The Field Before Preparing The Map. 2. Preparation Of A Detailed Inventory Of Surfaces, Exits, Culverts, And Trees To Be Cut Down3. Submitting An Application On Behalf Of The Ordering Party For Exemption From The Obligation To Locate A Service Duct. In Case Of Refusal, Implementation Of A Technological Channel Design.4. Preparation Of Construction And Executive Design - 3 Copies 5. Preparation Of Detailed Technical Specifications For The Execution And Acceptance Of Works - 2 Copies 6. Preparation Of A Bill Of Quantities - 2 Copies 7. Preparation Of An Offer Cost Estimate In The Sst System - 2 Copies 8. Preparation Of An Investors Cost Estimate In The Sst System, Divided Into Ranges - 2 Copies9. Obtaining Opinions, Arrangements, Permits And Other Documents Required To Be Attached Pursuant To The Provisions Of Separate Acts Or Copies Of These Opinions, Arrangements, Permits And Other Documents.10. Preparation Of Materials For Reporting Construction Works Dp 1183G From Km 9+400 To 16+300, Including: - Graphic Attachment (Sketches, Drawings) - Current Map For Design Purposes With Land Development On A Scale Of 1:500 With The Location Of The Reported Construction Works - Design Development Of Plots Or Land Carried Out By A Designer With Appropriate Construction Qualifications, In The Cases Referred To In Art. 30 Section 3 And Section 4 Of The Construction Law (Act Of July 7, 1994, Journal Of Laws Of 2019, Item 1186, As Amended) - Permits, Arrangements And Opinions Required By Separate Regulations, Including Arrangements With Network Operators.11. Preparation Of 1 Copy Of The Entire Project In Numerical Form On Cds (Additionally, The Drawing Part Must Be Provided In A Form Compatible With Autocad). 12. Carrying Out Public Consultations - Min. 2 Meetings In The Nowa Wieś Lęborska Commune3.2 As Part Of The Agreed Offer Price, The Contractor Is Obliged To Conduct Authors Supervision Over The Completed Design And Cost Estimate (I.E. Supervision Over The Compliance Of The Implemented Investment With The Project And Agreeing On The Possibility Of Introducing Alternative Solutions To The Project). In The Course Of Carrying Out The Designed Construction Works, The Contractor Is Obliged To Visit The Construction Site (At Least 3) At The Written Request Of The Employer Submitted At Least Three Days In Advance. The Designers Stay On The Construction Site Resulting From Design Errors Is Not A Stay Under The Authors Supervision. 3.3 Preparation Of The Permanent Traffic Organization Project – 3 Copies 4. It Is Recommended To Conduct A Detailed Site Visit In Order To Obtain All The Information Necessary To Prepare The Offer And Conclude The Contract.
|