The Subject Of The Order Includes The Implementation Of The Investment Entitled; Thermal Modernization Of The Indoor Swimming Pool In Jarosław. The Investment Task Is Co-Financed By The Government Fund Polish Order, Strategic Investment Program And Will Consist In Carrying Out Investor Supervision Of Construction Works. The Task Includes The Implementation Of Vertical Moisture-Proof Insulation With Insulation Of Walls In The Ground, Insulation Of External Walls Above The Ground Along With The Construction Of Facades, Insulation Of Flat Roofs, Replacement Of External Window Frames, Renovation Works. The Swimming Pool Building Is Not Under Conservation Protection. The Area Covered By The Investment Is The Investors Plot, With Registration Numbers No. 2439/17, District No. 2 - City Of Jarosław. The Task Will Include: - Replacement Of External Window Joinery, - Replacement Of Internal Window Sills, - Disassembly Of Sswin Devices And Reassembly, - Disassembly Of Existing Lighting Fixtures And Installation Of Led Illuminators After Insulation Works, - Disassembly And Reassembly Of The Lightning Protection System, Including Part Of The Flat Roof. ,- Insulation Of The Buildings Facade From The Outside,- Insulation Of Ceilings And Flat Roofs In The Ventilated And Non-Ventilated Parts,- Replacement Of Sheet Metal Flashings,- Replacement Of Gutters And Downpipes,- Execution Of External Facade Plasters,- Construction Of A Band Around The Building,- Air-To-Water Heat Pumps With Full Accompanying Works And Commissioning Of The Installation, - Internal Lighting, - Installation Of Photovoltaic Installations, - Necessary Accompanying Renovation Works, - Painting Works, - Finishing Works. In Terms Of Providing Investor Supervision For Investments. Investment Location: The Investment Is Located In Jarosław On A Plot With Registration Number Gr. 2439/17 - District 2, Concerns The Building Of The Indoor Swimming Pool At The Sports Hall In Jarosław At Ul. Sikorskiego 5B. The Works Should Cover All Buildings Included In The Indoor Swimming Pool Complex. Existing Condition Of The Building: Buildings 1, 2, 3.• Building With A Basement With Two Above-Ground Floors In The Service And Office Part And One Above-Ground Floor In The Swimming Pool Hall, • Volume - 14,841.60 M3, • Usable Area - 3,621.75 M2, • Building Area - 1,750 .96 M2, • Height Of The Facility - 8.96 M, • Insulation Of The Flat Roof, • Thermal Insulation Of The Walls - 5 Cm, • Insulated Flat Roof, • Thermal Insulation Of The Walls, • Volume - 7,048 M3, • Usable Area - 1,745.80 M2. As Part Of The Investment, The Scope Of Work Includes: Conducting General Supervision Over The Implementation Of The Investment And Its Financing, Along With Actual Confirmation Of The Works Performed, As Well As Controlling Construction Settlements And Signing The Final Works Acceptance Protocol. Supervision Over The Timeliness Of Construction Works, In Particular In Terms Of Meeting Their Deadlines. Completion. The Supervision Inspector Is Obliged To Fulfill The Obligations Of The Investor (Ordering Party). Note!• The Contractor Will Be Obliged To Cooperate Closely With The Facilitys Management While Carrying Out Construction Works.• The Offer Price Must Include All Costs Related To The Correct And Safe Performance Of The Task.
|