Engineering-Design Services For Traffic Installations – Bim-Planung Etcs Knoten Ingolstadt Lst, Tk, Eea, Bpp Lph 1-2 (3-4 Optional). The Subject Of The Award Is The Bim Planning Of The Following Trades: - Control And Safety Technology, - Telecommunications Technology, - Electrical Energy Systems (50 Hz), - Construction Phase And Construction Status Planning (Bpp) Of The Lph. 1-2 (Lph. 3-4 Optional) For The Ingolstadt Node (Ingolstadt Hbf. And Ingolstadt Nord). As Part Of The Etcs/Dstw Node Ingolstadt Project, A Dstw Is Being Built To Replace The Ingolstadt Hbf And Ingolstadt Nord Signal Boxes, Which Are Not Compatible With Etcs. The Relay Interlocking (Rstw) Ingolstadt Hbf Is Also Technically Unavailable And The Electronic Interlocking (Estw) Ingolstadt Nord (Estw-Uz, Built In 2002) Cannot Be Upgraded For Etcs. Furthermore, The Node Will Be Equipped With Etcs Level 2. This Will Close A 12 Km Gap On The Nuremberg-Ingolstadt-Munich (Nim) Route In The Context Of The Parallel Etcs Project For This Route. The Project Also Forms The Basis For The Future Upgrade Of The Entire Ingolstadt Network District To Etcs/Dstw.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78678482
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.