Asbestos-Removal Work – Administration Building Altendorfer Str. 103, 45143 Essen - Pollutant Remediation -. Technical And Structural Modernization Measures Are Planned In The Administration/Renovation Building. For This Purpose, Local Pollutant Remediation Work Must Be Carried Out In Advance And Tailored To The Measures. The Building Consists Of Components A-C: Component A: 4692 Sqm Over 6 Floors, Ground Floor 5Th Floor Component B: 4200 Sqm Over 7 Floors, Ground Floor 6Th Floor Component C: 7616 Sqm Over 8 Floors, Ground Floor 7Th Floor The Renovation Work In The Above Mentioned Areas Are To Be Carried Out In Approx. 360 Rooms And 45 Corridors. The Scope Of The Pollutant Remediation Essentially Includes The Following Work, Taking Trgs 519 And Trgs 521 Into Account: Dismantling Of Built-In Cupboards In The Area Of Parapets With Subsequent Removal Of Asbestos-Containing Plaster And Fillers From Parapet Surfaces. Removal Of Plaster And Fillers Containing Asbestos On Small Areas With Subsequent Core Drilling In Ceilings And Walls Partial Removal Of Plaster And Fillers Containing Asbestos For The On-Site Installation Of Smoke Protection Or Fire Protection Doors In The Hallway Walls And The Walls Of Installation Shafts Partial Dismantling Of Plasterboard Walls, Plasterboard Ceilings And Plasterboard Friezes With Asbestos Fillers For The On-Site Assembly Of Technical Installations. Dismantling Of Finned Radiators And Pipes With Asbestos-Containing Flanges Removal Of Floor Coverings Laid In Multiple Layers On Top Of Each Other With Both Pollutant-Free And Pah And Asbestos-Contaminated Leveling Compounds With Subsequent Treatment And Cleaning Of The Screed For On-Site Installation Of New Floor Coverings Partial Dismantling Of Kmf System Ceilings And Other Pollutant-Free Suspended Ceilings For On-Site Installation Of Technical Installations. The Above Work Must Be Carried Out From The Ground Floor To The 7Th, 6Th And 5Th Floors In The Respective Components A, B And C. For This Purpose, The Respective Floors/Components Are Completely Manufactured As Work Areas In Accordance With Trgs 519 For Extensive Work. To Avoid Contamination Of Surfaces That Do Not Require Treatment, All Renovation Work Must Be Carried Out In Accordance With The Above. Areas Based On Approved Low-Emission Processes. This Means That, In Addition To Maintaining A Negative Pressure Of 20 Pa In The Work Areas, The Minimum Standard Must Be Immediate And Additional Local Suction Using Approved Devices/Machines When Carrying Out Work/Renovation Work. The Work On The Basement Floors Essentially Includes: Removal Of Asbestos-Containing Plaster And Fillers From Small Areas With Subsequent Core Drilling In Ceilings And Walls. Partial Removal Of Asbestos-Containing Plaster And Fillers For The On-Site Installation Of Smoke Protection Or Fire Protection Doors In The Walls Of Installation Shafts. Partial Dismantling Of Plasterboard Walls, Plasterboard Ceilings And Plasterboard Friezes With Fillers Containing Asbestos For The On-Site Assembly Of Technical Installations. Partial Dismantling Of Kmf System Ceilings And Other Pollutant-Free Suspended Ceilings
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78677989
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.