3.1. The Subject Of The Order Is Construction Of Kręta Street In Kaszczor And Requires The Following Scope Of Works: • Reconstruction Of The Route In The Field, • Mechanical Cutting Of Trees With Removal And Removal Of Tree Trunks, • Dismantling Of Concrete Curbs On Concrete Footings, Bituminous Surface, Paving Stones And A Base Made Of Crushed Stone And Concrete, As Well As Cutting Bituminous Surfaces With Removal Of Rubble Off The Construction Site, • Excavations For Sewage And Inspection Wells, For Storm Sewage Channels And Collectors, And For Structural Layers Of The Road, Exits And Accesses To The Property With Removal Of Soil Off The Construction Site, • Construction Of Sewage And Inspection Wells, Linear Sewage Made Of Polymer Concrete, Sewers, Storm Sewage Collector, • Performance Of A Tightness Test Of The Constructed Storm Sewage System Along With Monitoring Of The Constructed Network, • Vertical Adjustment Of Ground Devices And Laying Of Two-Part Protective Pipes On Telephone And Electric Cables, • Mechanical Profiling And Compacting The Subsoil For Construction Layers On The Reconstruction Of The Surface After Installing The Rainwater Drainage System And On The Road, Under The Entrances And Entrances To The Property, • Strengthening The Subgrade With Cement-Stabilized Soil, • Making The Basic Foundation With Continuous-Grained Crushed Aggregate, Mechanically Stabilized With Bituminous Mass And Cement Concrete, • Cleaning And Sprinkling Individual Structural Layers Of The Road With Asphalt Emulsion, • Setting A 15X30 Cm Vibro-Pressed Concrete Curb On A Concrete Footing With Resistance, • Setting A 12X25 Cm And 8X30 Cm Vibro-Pressed Concrete Curb On A Concrete Footing With Resistance, • Laying A Sewer From Two Rows Of Paving Stones Concrete Paving On A Concrete Footing, • Laying A Wearing Course Of Asphalt Concrete Thick. 5 Cm On The Reconstruction Of The Road After Installing The Rainwater Drainage System, • Laying The Surface With Vibro-Pressed Chamfered Paving Stones, Thickness. 8 Cm In Gray On The Pedestrian And Driving Route And Graphite On The Entrances To The Property And In Red On The Entrances To The Property, • Planting Of Roadsides And Topsoiling With Grass Seeds, • Setting Up Vertical Markings.3.2. A Detailed Description Of The Subject Of The Order Is The Design Documentation Prepared By: Road And Street Design Andrzej Włodarczak - Annex No. 9 To Swz.3.3. The Contractor Will Make The Subject Of The Order From Its Own Materials.3.4. The Scope Of The Subject Of The Order Also Includes Post-Construction Geodetic Inventory.3.5. The Contractors Obligations Include Carrying Out All Necessary Tests And Bearing All Related Costs, As Well As Preparing A Traffic Organization Project, Installing And Maintaining Signage For The Duration Of The Works.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78636551
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.