2. The Subject Of The Order Is The Reconstruction Of Roads In The Town Of Szczaniec And In The Town Of Wolmierzyce. The Contracts In Question Consist Of 3 New Ones. Tasks: Task 1. Reconstruction Of Roads In The Town Of Wolmierzyce, Szczaniec Commune. Scope Of Work: - Renovation/Local Reconstruction Of The Road Surface With A Length Of 1,395.45 M, - Creation Of Aggregate Roadsides/Cutting Of Dirt Roadsides, - Construction Of A Sidewalk, - Construction Of A Parking Bay, - Creation Of Street/Slope Drains, - Demolition And Reconstruction Of Road Inlets With Sewers, - Land Profiling And Topsoiling Of Green Belts, - Height Adjustment Of Existing Manholes And Covers Of Underground Utilities. Task 2. Reconstruction Of The District Road No. 1210F - Ul. Kochanowskiego In Szczaniec (From The Intersection With Ul. Herbowa To The Intersection With Ul. Asnyka). Scope Of Work: - Reconstruction/Renovation Of The Road Surface With A Length Of 383.1 M, - Construction Of A Sidewalk, - Reconstruction Of Exits, - Construction Of A Parking Bay, - Demolition And Reconstruction Of Storm Drains And Sewers, - Height Adjustment Of Existing Manholes And Covers Of Underground Utilities, - Land Profiling And Topsoiling Of Green Belts. Task 3. Reconstruction Of The District Road No. 1211F - Ul. Herbowa In The Town Of Szczaniec And Municipal Roads With Reconstruction Of The Rainwater Drainage Network. Scope Of Work: - Reconstruction Of The Road Surface With A Length Of 555.24 M - Construction Of A Two-Way Bicycle Path, - Construction Of A Pedestrian And Bicycle Route, - Construction Of A Sidewalk, - Reconstruction Of Exits, - Reconstruction Of Off-Road Stairs, - Reconstruction Of Parking Bays, - Replacement Of Barriers (Barriers U-11A, U-14), - Reprofiling Of Embankment Slopes Within The Road, - Reconstruction Of The Rainwater Drainage Network, - Height Adjustment Of Existing Manholes And Covers Of Underground Utilities, - Profiling Area And Topsoiling Of Strips.3. A Detailed Description Of The Subject Of The Order Is Specified In: A) Design Documentation: - Task 1 - Design Documentation - Annex No. 1A1 To The Swz, - Task 2 - Design Documentation - Annex No. 1A2 To The Swz, - Task 3 - Design Documentation - Annex No. 1A3 To The Swz, B) Bill Of Quantities: - Task 1 - Bill Of Quantities - Annex No. 1B1 To The Swz, - Task 2 - Bill Of Quantities - Annex No. 1B2 To The Swz, - Task 3 - Bill Of Quantities - Annex No. 1B3 To The Swz, C) Technical Specification Of Execution And Acceptance Of Construction Works: - Task 1 - Stwiorb - Annex No. 2A To The Swz, - Task 2 - Stwiorb - Annex No. 2B To The Swz, - Task 3 - Stwiorb - Annex No. 2C To The Swz.
|