Providing A Lighting Service Consisting In Maintaining Lighting; Streets, Squares, Open Parks And Green Areas, As Well As Sidewalks And Pedestrian Crossings Located In The Mikołów Commune In Terms Of Lighting Infrastructure Owned By The Mikołów Commune. Scope Of Work: 1) Ongoing Maintenance Of Street Lighting In The Commune, 2) Maintaining The Lighting Of Light Points In The Commune Quantity Not Less Than 95% Of The Total, 3) Replacement Of Damaged Light Sources, Lamp Covers, Replacement Of Led Lamps Up To 20 Pieces During The Duration Of The Contract. Detailed Requirements For Led Road Luminaires: - Supply Voltage Of The Luminaires: Ac 220V - 240V/50 Hz. - Operating Range Of The Luminaire At Ambient Temperature: - 20°C To +35°C. - Efficiency Of The Entire Luminaire: >140 Lm/W. - Service Life The Entire Setting Cannot Be Less Than 80,000 Hours. - Power Factor Cosφ: 0.927 For Rated Power. - Overvoltage Protection 10 Kv - Color Rendering Index: Cri (Ra) ≥ 70. - Tightness Of The Luminaires: Ip 66. - Color Temperature 3000K And 4000K - In Accordance With The Annex For Replacing The Luminaires With Led. - Fixtures Must Have Ec Declarations Of Conformity And The Ce Mark. - The Luminaires Are To Be Equipped With Controllers Enabling The Integration Of The Control System With The Luminaires For Individual Or Group Management Of The Luminaires Operation, Including Any Programmable Power Reduction At Specific Hours. Controllers Mounted To Fixtures Using A Universal Socket, E.G. Nema 7–Ansi C136.41. The Controllers Are To Work With 1-10V Or Dali Power Supplies. Communication Between Controllers Should Be Wireless. 4) Replacement Of Digital Astronomical Controllers, Doors, Covers Of Pole Recesses, Fuse Plates, Security Elements, And All Other Elements Of Lighting Equipment For Cable And Overhead Networks, 5) Disposal Of Used Light Sources, 6) Washing Dirty Lampshades Of Street Luminaires Once A Year - Applies To Luminaires With Ball Shape And The Remaining Lampshades When Replacing Light Sources, 7) Cutting Down Tree Branches That Collide With Street Lighting Poles, Fixtures And Wires, 8) Setting The Lighting Control Devices, 9) Current Repairs Of Street Lighting Cabinets, 10) Location And Repairs Of Damaged Cables, Overhead Network Wires And Restoring The Area (Sidewalks, Roadways, Greenery) To Its Original Condition After Completion Of Operational Works, 11) Painting Corroded Metal Poles, Booms, Doors, Covers And Pole Recesses,12) Securing Broken Wires, Damaged Poles And Pole Recesses As A Result Of Theft, Storms, Road Collisions Threatening Human Health And Life - Also Applies To Lighting During The Warranty Period,13) Plumbing (Straightening) Inclined Poles Of Used Street Lighting, 14) Inspection Checks At Night Of The Lighting Efficiency, Carried Out In Accordance With Working Arrangements, With The Participation Of The Ordering Party, 15) Performing Measurements Of The Effectiveness Of Anti-Shock Protection And Measurements Of Cable Insulation Resistance For Street Lighting, Checking The Technical Condition Of The Installation In Accordance With The Schedule Presented And Approved By The Ordering Party - Once During The Term Of The Contract. 16) Preparing Monthly Reports Showing The Dates Of Received Defects And The Dates Of Their Removal, And Submitting These Reports To The Ordering Party By E-Mail By The 10Th Day Of The Following Month, 17) Replacing Light Sources Only At Night, 18) Confirming The Removal Of Reported Defects To The Ordering Party Each Time By E-Mail Within One Day From The Date Of Completion Of The Works,19) Immediately Notifying The Employer Of Any Serious Road Lighting Failures,20) Removing Failures Reported By The Employer Or Residents Of A Given Street Regarding The Lack Of Lighting On The Entire Section Of The Street, Including More Than 3 Light Points - Within Up To 24 Hours. 21) Repair Of Faulty, Single Light Points, No Later Than .... Days From The Date Of Notification By The Ordering Party, 22) Installation And Disassembly In Indicated Places Of Decorative Christmas Lighting, I.E. Decorative Led Pole Frames - 87 Pcs And Execution Their Inspections And Possible Repairs Before The Winter Season, Installation Of Led Light Curtains - 22 Pcs, Led Icicles 10 M - 7 Pcs, Led Light Braids For Christmas Trees - 90 Pcs And For Trees - 4 Pcs.23) Connecting And Disconnecting The Electricity Supply In The Indicated Places Of Decorative Led Christmas Lighting, I.E. Decorative Frames Permanently Installed On The Poles Of The Low Voltage Network Associated With Street Lighting -75 Pcs. 24) Maintaining The Constant Technical Efficiency Of Lowered Distribution Boxes (4 Pcs) Supplying The Christmas Lighting Of The Market Square.25) Assembly And Disassembly In Newly Purchased Decorative Christmas Lighting In The Indicated Places, Estimated In The Quantities Below: A) Assembly And Disassembly Of Decorative Pole Frames With Electric Power Supply - 20 Pcs, B) Assembly And Disassembly Of Light Curtains With Electric Power Supply 20 Pcs, C) Assembly And Disassembly Of Icicles Lights With Electric Power Supply 5 Pcs, D) Assembly And Disassembly Of Light Braids With Electric Power Supply 20 Pcs.
|