Remove Approx. 1,920 M3 Of Topsoil; Loosen Approx. 870 M3 Of Soil; Install Approx. 565 M3 Of Floor; Cover Approx. 260 M3 Of Topsoil; Install Approx. 1,400 T Of Gravel Turf Mixture; Break Off Approx. 230 M Of Drainage Pipe; Lay Approx. 1,340 M Of Seepage Pipes; Produce Approx. 170 M Of Connection Lines Dn 150; Create Approx. 287 M Of Drainage Pipes; Approx. Make 5 Pcs Shafts; Make Approx. 21 Pcs Of Street Gullies; Install Approx. 3 M Of Box Gutter; Pick Up/Mill Approx. 3,830 M³ Of Asphalt Pavement; Hold Approx. 690 T Of Pitch-Containing Fastening; Accommodate Approx. 250 M² Of Concrete Ceiling; Take Up Approx. 525 M3 Layer Without Binder; Apply Approx. 230 M² Of Base Layer With Hydraulic Binder; Take Up Approx. 170 M² Of Paving; Pick Up Approx. 510 M Of Concrete Bristles; Take Approx. 250 M Of Paving Strips Made Of Concrete Blocks; Install Approx. 3,925 T Of Antifreeze Material; Install Approx. 7,965 T Of Asphalt Mix; Place Approx. 1,045 M Of Concrete Curbs; Create Approximately 720 M Strips Of Concrete Paving Stones.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78594332
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.