Double Contract For The Modernization Of The Agrarian Defense Theater In La Selva Del Camp (Phase 2)..According To The Executive Project, The Various Solutions To Modernize The Theater Consist Of Actions That Have The Least Impact On The Structure Of The Building And That Respond To The Needs Of A Modern Theater. Given The Specificity Of The Works Of This Phase Ii, It Has Been Decided To Divide The Contract Into 3 Lots: Lot 1. Redo The Line That Feeds The Stage Box, Pipeline Between The Stage And The Future Control Room In The Chicken Coop, Equip The Necessary Work And Consumption Points And Install A Grounding Network. Install Work Walkways On Both Sides Of The Scenic Box With Two Levels On The Right And Three Levels On The Left. Installation Of The Catwalk On The Platform In Front Of The Mouth Of The Stage With The Side Accesses. Installation Of Theater Air Conditioning Ducts, Left As A Provision To Connect To The Future Installation Of Air-Conditioned Machinery. Placement Of Two Communication Firewall Doors Between Stage Box And Hygienic Services Vestibule. Placement Of Anti-Panic Bars At Two Of The Exit Doors Of The Theater. Lighting Control Installation In The Stage Box. Lot 2. Install Hoppers, Pulleys, Winches And Electric Actuators Necessary For Theater Operation. Installation Of Fire Curtain Between Stage Box And Seating Area. Installation Of Electrified Bars With Their Wiring To Power The Stage Lighting Focus. Lot 3. Active Fire Protection.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78591731
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.