I. The Subject Of The Order Is The Construction Of A Fire Alarm System In The Facility Of The Miechowski Community Center In Miechów At Ul. Racławicka 10. Stage Ii. The Facility In Question Is Entered Into The Provincial And Municipal Register Of Monuments. The Building Of The Miechowski Community Center Is A Detached Facility, Located In The Vicinity Of Single- And Multi-Family Buildings And Buildings With A Service Function. The Building Has Various Foundations, I.E. Stone And Brick Foundations, As Well As Reinforced Concrete Footings With Different Levels Of Foundation Below The Ground Level. The Foundation Walls Were Made Of Bricks With Cement Mortar. The Walls Above Ground Are Made Of Brick. Various Ceilings, Segmental Brick Vaults, Monolithic Reinforced Concrete, Reinforced Concrete On External, Internal And Internal Load-Bearing Walls. The Building Has Two Emergency Staircases And Two Internal Staircases Treated As Technical Staircases. Ii. The Scope Of Works Will Include In Particular: 1. Construction Of Cable Routes And Laying Cabling (Punching Holes, Installation Of Pipe Bushings, Cutting Grooves For Plastered Cables, Installation Of Holders For Winidur Pipes And Cable Ducts, Laying Of Winidur Pipes, Installation Of Pvc Installation Channels, Structures Supporting Ladders And Cable Trays, Installation Of Cable Ladders, Cable Ducts, Gr Partition Walls Made Of Plasterboards On Metal Gratings, Implementation Of Passive Fire Protection, Removal Of Piled Debris). 2. Construction Of The Ssp (Installation Of A Compact Alarm Control Panel For 16 Detection Lines, Installation Of Fire Sockets - Detectors, Installation Of Optical Smoke Detectors, Installation Of Additional Detector Activation Indicators, Installation Of Linear Smoke And Temperature Detectors, Installation Of Automatic Fire Alarms, Installation Of Manual Fire Warning Devices, Installation Of An Additional Function Card Of The Alarm Control Panel, Installation Of A Power Supply, Installation Of A Maintenance-Free Battery, Assembly Of A Housing, Installation Of An External Optical-Acoustic Siren Without Emergency Power Supply, Programming Of Sap Detection Lines In Control Panels And Adapters, Checking And Electrical Measurements Of Signaling Circuits, Measuring The Sound Intensity Of An Acoustic Siren, Training). 3. Electrics (Checking And Measuring The Complete 1-Phase Low Voltage Electrical Circuit, Testing And Measuring The Earthing Installation). 4. Finishing Works (Protecting Floors With Foil, Filling Grooves, Ordinary Internal Plasters, Preparing Surfaces For Painting With Emulsion Paints, Painting Internal Surfaces Twice With Emulsion Paints). Iii. The Detailed Scope Of Work Results From Annex No. 7 (Opz) To The Swz, Which Also Includes The Bill Of Quantities, Technical Design, Stwiorb And A Template Contract For The Performance Of Works - Annex No. 6 To The Swz.
|