Construction Work For Buildings Relating To Health – 264_2 Kizba2 - Kbo Kinderzentrum München - 3010-01 Containeranlagen. 1.0 Psch Planning And Statics Of The Complete 3-Story Container System 1.0 Psch Construction Site Equipment Including Lifting Equipment For The Construction Of The Complete 3-Story Container System 41.0 Pcs. Set Up The 1-Story Container System, As An Examination/Treatment Room/Office, On The 1St Floor. 1St Floor, 2Nd Floor, Set Up 1.0 Pcs Container 1 System, As A Telephone/Edp Distribution Room, On The 1St Floor, Set Up 5.0 Pcs Container 1 System, As A Toilet Including Sanitary Items, On The Ground Floor, 1St Floor, On The 2Nd Floor, Set Up A 1.0 Pc Container Of 1 System, As A Shower/Changing Room Including Sanitary Items, Set Up A 1.0 Pc Container Of 1 System On The Ground Floor, As A Garbage Room, Set Up A 1.0 Pc Container Of 2 System On The Ground Floor, As A Technical Room Ventilation, Set Up 1.0 St Container 3-Unit System On The Ground Floor, As Dry Storage, Set Up 1.0 St Container 3-Unit System On The Ground Floor, As Dining Room/Serving, Set Up 1.0 St Container 4-Unit System On The Ground Floor, As Dining Room, In On The Ground Floor, Set Up 1.0 Pcs Containers For 5 Units, As A Kitchen/Scullery (Without Kitchen Equipment), On The Ground Floor, Set Up 82.5 M Hall Containers With A Width Of 2.5 M, On The Ground Floor, 1St Floor, 2Nd Floor 66.0 M2 Of Drywall Facing Shells In Containers 26.0 M2 Drywall Double Stud Wall In Containers 43.0 M2 Wall Cladding Stainless Steel Sheet In Containers 1.0 St Gable Roof Over Container System, Approx. 27.5/14.7 M, Height Approx. 9.3 M 2.0 St 2-Flight External Staircase To The Container System, Approx. 3.34/7.30 M, Including Pent Roof, Height Approx. 9.1 M 90.0 M2 External Walkways On The Ground Floor Containers, As A Steel Construction With Grating Tread And Steel Railings 1 .0 Pcs Foundation Of The Container System, Including Earthworks, Floor Plan Approx. 27.5/14.7 M 2.0 Pcs Foundation Of The External Staircase Container System, Including Earthworks, Floor Plan Approx. 3.34/7, 30 M 450.0 M3 Excavated Earth For Pipes And Shafts 440.0 M Laying Sewage Pipes 400.0 M Laying Irrigation Pipes, Stainless Steel 1.0 Piece Air Conditioning Unit Container Dining Room, With Outdoor And Indoor Unit 1.0 Piece Air Conditioning Unit Container Elt/Server Room, With Outdoor And Indoor Unit 41.0 Pieces Air Conditioning Unit Container Treatment / Office, For Heating And Cooling 17.0 Pieces Heating Electric Convector Wall-Mounted In Containers 2.0 Pieces Ventilation Device Decentralized, In The Container Dining Room, 1,000 M3 / H 10.0 Pieces Exhaust Fans Toilet -Container 1.0 Pcs Electrical Installation Container Elt Room With Distributor And Bma 1.0 Psch Electrical Installation Of The Container System 220.0 M Ring Earth Stainless Steel Container System 150.0 M Foundation Earth Galvanized Steel Container System
|