Road Construction Works – Epc Redevelopment Bernard Gouvart Commune Of Cappelle La Grande – Road Works. The Work Concerns: The Total Redevelopment Of The Espace Public Central Bernard Gouvart. In This Context, The Paving Will Be Of The Same Type As Those Used During The First Phase Of Work Carried Out In 2019 (Parvis De La Mairie) Both In Terms Of Colors And Formats (With The Exception Of The Square For Which The Dimensions Paving Stones Will Be Different). The Supply And Installation Of Street Furniture (The Furniture Will Be Of The Same Type As That Installed During The First Phase Of Work). The Supply And Installation Of A Rainwater Collection Tank The Construction Of Trenches Including The Installation Of Conduits For Public Lighting. The Construction Or Reconstruction And Connection Of Rainwater Collection Works On Roads Safety Installations Associated Work On Safety Equipment, Various Networks, Installation Of Conduits And Sanitation Connections. The Development Of Green Spaces Contributing To Rainwater Management (Stockholm Pits)
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78511295
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.