1. The Subject Of The Order Is The Execution Of A Task In The Design And Build System Called: Reconstruction Of The Water Treatment Plant In The Brańsk Commune Co-Financed By The Government Program Of The Polish Order Fund: Strategic Investment Program. The Scope Of The Investment Includes Work In The Following Locations: 1. Water Treatment Plant Koszewo – Development Of Design Documentation, Thermal Modernization Of The Existing Water Treatment Plant Building. Construction Of A New Room For A Chlorination Plant And A Power Generator. Construction Of Two Steel Expansion Tanks With A Capacity Of 100 M3 Each, Construction Of A Backwash Settling Tank With A Capacity Adapted To The New Technological System. A Uv Lamp For Water Disinfection Will Be Installed In The Internal Installation. Reconstruction Of The Existing Technological System To A Capacity Of 400 M3/D. Devices And Piping Made Of Stainless Steel. After Reconstruction, The Station Is Fully Automatic. Construction Of A Dn160 Water Supply Connection To Enable Power Supply To New Towns And Reconstruction Of The Backwash Drainage System Into An Indoor Gravity One With A Diameter Of Dn200. Installation Of A Photovoltaic Installation With A Power Of Up To 49 Kw With Energy Batteries And Implementation Of A Video Monitoring Installation At The Suw And An Installation Remotely Monitoring The Stations Operating Parameters, I.E. A System For Remote Management Of The Stations Operation.2. Suw Kalnica – Development Of Design Documentation, Reconstruction Of The Technological Building. Reconstruction Of The Water Technological System To A Capacity Of 600 M3/D. Construction Of Accompanying Infrastructure, Including: Sewage And Water Connections, Power Supply, Control And Lighting Installations. Reconstruction Of The Accompanying Infrastructure, Including: Deep Wells, Water Supply Networks, Raw Water Connections, Lightning Protection And Grounding Installation For Building Protection, Installation Of Power Supply From A Generating Set. Construction Of Two Expansion Tanks With A Capacity Of 100M3 Each And A Five-Chamber Backwash Settling Tank. A Uv Lamp For Water Disinfection Will Be Installed In The Internal Installation. Improving The Operation Of The Existing 40 Kw Photovoltaic Installation, Including: By Installing Remote Monitoring Of The Installation. Implementation Of A Video Monitoring Installation At The Water Supply Station And An Installation Remotely Monitoring The Stations Operating Parameters, I.E. A Remote Station Operation Management System.3. Modernization Of The Brzeźnica Water Treatment Plant - Modernization Of The Water Disinfection System By Installing Uv Lamps. Construction Of A Video Monitoring Installation At The Water Supply Station And An Installation Remotely Monitoring The Stations Operating Parameters, I.E. A Remote Station Operation Management System. 4. Modernization Of The Domanowo Water Treatment Plant - Modernization Of The Water Disinfection System By Installing Uv Lamps. Construction Of A Video Monitoring Installation At The Water Supply Station And An Installation Remotely Monitoring The Stations Operating Parameters, I.E. A Remote Station Operation Management System. The Material Scope Of The Task And A Detailed Description And Method Of Execution Of The Order Are Included In The Functional And Utility Program Constituting Annex No. 1.1. To 1.4. To The Swz And The Contract Template Constituting Annex No. 6 To The Swz. The Ordering Party Informs That The Minimum Required Warranty And Guarantee Period In The Proceedings In Question Is 48 Months.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78444427
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.