1. The Subject Of The Order Is The Execution Of A Task In The Design And Build System Called: Reconstruction Of Water Pumping Stations Located In The Brańsk Commune Co-Financed By The Government Program Of The Polish Order Fund: Strategic Investment Program. The Investment Reconstruction Of Water Pumping Stations Located In The Brańsk Commune Includes: 1.1. Glinnik Pumping Stations - Preparation Of Documentation, Demolition Of Existing Expansion Tanks And Underground Water Supply, Sewage And Electrical Installations. In Place Of The Demolished Tanks, Construction Of Two New Steel Tanks With A Capacity Of 100 M3 Each And New Underground Installations: Water Supply, Sewage And Electricity. Thermal Modernization Of The Pumping Station Building, Including The Replacement Of The Hydrophore Set And Internal Piping With Stainless Steel Piping. Installation Of A Uv Lamp For Water Disinfection. Installation Of A Photovoltaic Installation With Energy Batteries Each With A Capacity Of Up To 20 Kw. Implementation Of A Video Monitoring Installation At The Pumping Station And An Installation Remotely Monitoring The Operating Parameters Of The Pumping Station, I.E. A Remote Management System For The Stations Operation. 1.2. Szmurły Pumping Stations - Preparation Of Documentation, Demolition Of Existing Expansion Tanks And Underground Water Supply, Sewage And Electrical Installations. In Place Of The Demolished Tanks, Construction Of Two New Steel Tanks With A Capacity Of 100 M3 Each And New Underground Installations: Water Supply, Sewage And Electricity. Thermal Modernization Of The Pumping Station Building, Including The Replacement Of The Hydrophore Set And Internal Piping With Stainless Steel Piping. Installation Of A Uv Lamp For Water Disinfection. Installation Of A Photovoltaic Installation With Energy Batteries Each With A Capacity Of Up To 20 Kw. Implementation Of A Video Monitoring Installation At The Pumping Station And An Installation Remotely Monitoring The Operating Parameters Of The Pumping Station, I.E. A Remote Management System For The Stations Operation. 1.3. Załuskie Kościelne Pumping Stations - Preparation Of Documentation, Construction Of Two New Steel Tanks With A Capacity Of 100 M3 Each And New Underground Installations: Water Supply, Sewage And Electricity. Thermal Modernization And Reconstruction Of The Pumping Station Building, Including The Replacement Of The Hydrophore Set And Internal Piping With Stainless Steel Piping. Installation Of A Uv Lamp For Water Disinfection. Installation Of A Photovoltaic Installation With Energy Batteries Each With A Capacity Of Up To 20 Kw. Implementation Of A Video Monitoring Installation At The Pumping Station And An Installation Remotely Monitoring The Operating Parameters Of The Pumping Station, I.E. A Remote Management System For The Stations Operation. 2. The Scope Of The Task And The Detailed Description And Method Of Execution Of The Order Are Included In The Functional And Utility Programs Constituting Annexes No. 1.1. Until 1.3. To The Swz And The Contract Template Constituting Annex No. 6 To The Swz.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78444413
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.