The Subject Of The Order Is The Implementation Of The Task Titled: Revitalization Of The Historic City Park In Przemków. The Subject Of The Investment Is The Development Of The Area Of The Historic City Park In Przemków Located On Part Of Plot No. 479/1, Przemków Area. The Planned Investment Involves: Maintenance Of The Existing Plant Cover, Exposure Of Places Of Historical Importance, Demolition Roofing And Expansion Of The Stage, Reconstruction And Expansion Of Walking Paths, Equipping The Area With Small Architecture Elements And Reconstruction Of Area Lighting And Stage Power Supply. The Scope Of The Order Includes: 1. Development Of The Area Of The Historic City Park In Przemków: A) Construction Works: Drainage Of Rainwater - On The Surface To The Green Area, Widening Of The Surface From Granite Cubes With A Granite Edge For Benches And Garbage Bins, Widening Of The Benches With Colored Mineral Surface Natural Sand Without Edges, Expansion Of The Existing Path With A Mineral Surface By Extending It (Sand-Colored Mineral Surface, Permeable Or Semi-Permeable Surfaces, Providing Tree Roots With Access To Air And Water); Demolition Of The Roof, Wall And Floor Of The Existing Stage: Expansion Of The Plinth Stage With Field Stone Masonry Along With Placing An Electrical Box In The Plinth To Power The Stage And Part Of The Area Lighting, Construction Of A New Stage Floor, Built With A Sloped Concrete Slab (Expansion Joints), Structurally Reinforced, Mechanically Troweled And Impregnated Hardening Topping; B) Landscaping Of Green Areas (All Works Within The Forest Stand Should Be Carried Out In Accordance With The Nature Protection Act): Felling Of English Oak In Accordance With The Decision, Planting In Accordance With The Decision - Oak With A Diameter Of Not Less Than 20-30 Cm (Measured At A Height Of 100 Cm), Works Maintenance On The Tree Stand In Accordance With The Decision; C) Small Architecture: Dismantling The Existing Small Architecture (Benches, Garbage Bins, Information Board), Installation Of 15 Benches With A Backrest Without Armrests, Based On A Cast Iron Frame Spray-Painted In Black, A Seat And Backrest Made Of Spruce Wood Impregnated And Covered With Dark Brown (Walnut) Varnish, Installation Of 16 Waste Bins (Not Permanently Attached To The Ground, Made Of Galvanized Steel Structure, Painted In Black, Bin Insert With Steel Ashtray) Galvanized, Casing Made Of Coniferous Wood Strips (Dark Brown Spruce, Walnut), Production And Assembly Of An Information Board With Photos Of The Castle Along With A Short History, Board Made Of Galvanized Sheet Metal Mounted On Two Steel Posts, Mounted By Anchoring, Table For Educational Games With 4 Seats. Table Structure Made Of Galvanized And Black Powder-Coated Steel, Granite Top, Coniferous Wood Boards (Spruce) Impregnated And Painted With Dark Brown (Walnut) Varnish Stain, Placed Directly On The Ground, Fixed By Anchoring, Assembly Of 3 Pieces Of Benches Surrounding The Selected Oak Trunks. Benches Made To Individual Order As Wooden Ones Made Of Spruce Wood Impregnated And Covered With A Dark Brown (Walnut) Varnish Stain, Cleaning, Degreasing And Double Painting With Anti-Corrosion Paint For The Metal Of Footbridge Balustrades; D) Area Lighting: Dismantling Some Of The Lighting Poles Together With The Fixtures ( Northern Part Of The Area), Illumination Of Lion Statues With Led Ground Spotlights, The Designed Park Lanterns Will Have The Ability To Control The Lighting Intensity Powered From The Existing 16A/230V Circuit (E.G. Gn-10) Located At The Transformer Station, And Partly From The Electrical Cabinet Built Into The Stage , Installation Of 11 Pieces Of Traditional Park Lanterns.2. Construction Of The Lighting Network: Construction Of A Power Line With A Voltage Of 0.4 Kv: - Line No. 1 (21 Led Lighting Fixtures 42 W, 3750 Im Ii Class With 5 M Poles On Foundations + 2 Ground Lighting Fixtures 27W Warm - Line No. 2 (4 Fixtures Led Lighting 42W, 3750 Im Class Ii With 5 M Poles On Foundations, Construction Of Two Sop Connectors (Park Lighting Cabinet), Foundation Of 25 5.0 M High Poles On Foundations Along With Park Luminaires And 2 Ground Led Luminaires, Commissioning Of Lighting .Note: In The Land Development Plan, Point 6.3.4 Contains Information About A Seedling With A Diameter Of Not Less Than 20-30 Cm. In The Description Of The Seedling, The Term Diameter Should Be Replaced With The Term Circumference. The Planted Pedunculate Oak Should Have A Circumference Of 25-30 Cm As Specified In The Dwkz Decision And This Parameter Should Be Included In The Cost Estimate. The Contractor Is Responsible For Carrying Out The Work In Accordance With The Design Documentation, The Technical Specification For The Execution And Acceptance Of Works, And The Permit To Perform The Works Covered By The Task. Note - Detailed Description Of The Subject Of The Order Includes: Technical Specification For The Execution And Acceptance Of Works, Technical Documentation, Bills Of Quantities, Constituting Annexes To The Swz.
|