Heating, Ventilation And Air-Conditioning Installation Work – Air Conditioning Systems According To Din 18379. Two-Story New Extension With Partial Basement For The Rainbow School. The Property Is Located Approximately 6 Km West Of The City Center Of Göttingen. In The East, The Building Plot Borders On Diedershäuser Straße And In The North On Harrenacker Street. An Access Road To The Neighboring Sports Field Delimits The School Property To The West. The Construction Site For The Extension Is Located In The South Of The Property, On The Green Meadow Adjacent To The Existing Buildings. The Building Is Designed As A Polygonal Solitaire, Which Is Placed Freely On The Meadow And Is Connected To The Existing Building With A Connecting Structure. The Entrance Is In The Connecting Building With A Canopy. As Part Of The Construction Project, The Existing Staircase On The South Wing Of The Existing Buildings Will Be Demolished And Readjusted. The Elevator System Advertised Here Ensures Barrier-Free Access To Both The Existing Building And The New Building. Please Note The Following Note: The Work Will Be Carried Out During School Operations While The Existing Buildings Are In Ongoing Use. School Operations Have Absolute Priority At All Times. Disabilities Caused By The Operation Do Not Constitute A Claim To Additional Compensation. The Local Construction Management, In Consultation With The School Management And The Executing Companies, Will Ensure That Everything Runs As Smoothly As Possible In The Long Term. All Employees Must Be Made Aware Of Their Obligation To Cooperate In This Regard. Due To Ongoing Operations, Work Must Be Carried Out With Minimal Dust, Noise And Vibration. Particularly Noise-Intensive Work Must Be Postponed To Non-Operational Times (Afternoons, Holiday Periods) After Prior Consultation With The Local Construction Management! The Client (Ag) Provides A Higher-Level Construction Site Facility On The Property With A Construction Fence, Access Road And Construction Site Facilities; A Sanitary Container Is Provided Free Of Charge. The Ag Does Not Provide Accommodation Containers. -2 Pieces Of Supply And Exhaust Air Devices For Indoor Installation, Filter Heater (1X 11,000M³/H And 1X 1,000M³/H) -750M² Galvanized Sheet Steel Duct Network, Square -150M Spiral Folded Pipe, Galvanized -22 Fire Dampers -37 Swirl Outlets; 22 Duct Grilles And 16 Disc Valves - Insulation Of The Ventilation Ducts With Mineral Fiber Mats And Elastomer Foam Panels - 5 Years Of Maintenance And Inspection According To Amev Contract Template
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78353429
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.