Central Heating Installation Work – 24 E 040 - 1.Ba - Heating Systems Din 18381. - 1 Chp System With 20Kw Electric. /45 Kw Thermal Output - 3 Air-Water Heat Pumps, Each With 55 Kw Heating Output - 2 Units. Gas Condensing Boilers Each With 300 Kw Heating Output - 27 Units. Heating Circuit Groups Up To 13 M3/H In Central Stations And Substations With Pumps, Control And Regulation Systems. , Shut-Off Valves, Dirt Traps And Partly Heat Meters - 6 Pieces Of Plate Heat Exchanger Up To 60Kw For System Separation - 5 Pieces Of Buffer Storage 750 To 2500 Liters - 5,200 M Of Heating Pipes Made Of Stainless Steel Dn 15 - Dn 100 - Various. Operating Equipment Such As System Protection, Pressure Maintenance, Make-Up - 120 Radiators As Steel Tube Radiators - 1,250 M2 Of Underfloor Heating - 2,000 M2 Of Sports Floor Heating
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78344231
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.