Execution Of Hole Filling With Application Of Asphalt Concrete And Connection Paint, Recomposition Of Base And/Or Sub-Base For Closing Trenches Of Soil Improved With Cement (2% Content) - Including Removal And Placement Of Material. Af_12/2020, Renovation Of Gutters Or Gutters In Concrete Cast In Place, Renovation Of Simple Boca De Lobo, Renovation Of Double Boca De Lobo, Renovation Of Triple Boca De Lobo, Replacement Of Hat Guide For Boca De Lobo, Replacement Of Concrete Cover For Boca De Lobo, Milling Of Asphalt Pavement (Depth Up To 5.0 Cm) - Exclusive Transport. Af_11/2019, Transport With 6 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Recomposition Of Base And Or Sub-Base For Closing Simple Graded Crushed Trenches - Including Removal And Placement Of Material. Af_12/2020, Running Spout Base, Box Opening Up To 25 Cm, Includes Excavation, Compaction, Transport And Preparation Of The Sub-Bed, Binder Bituminous Priming, Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Including Loading And Transport ., Execution Of Reinforced Concrete Flooring (Pca), Fck = 30 Mpa, Thickness Of 15.0 Cm. Af_04/2022, Raising Or Lowering A Manhole Cover, Implementing A Combined Guide And Gutter In Cast-In-Place Concrete, Transverse Undulation In Asphalt Mass? Speed Bump Type B Of Roads With Resurfacing, Supply And Installation Of Street Sign Including Support In Galvanized Steel Tube, Supply And Installation Of Traffic Regulation Or Warning Sign Including Support In Galvanized Steel Tube, Horizontal Signage In Thermoplastic Mass Hot By Extrusion, Thickness Of 3.0 Mm, For Banners, For Legends, Concrete Tube Ps-2), Dn= 400Mm, Concrete Tube Pa-2), Dn= 600Mm, Dn= 800Mm, Execution Of Sidewalk (Sidewalk ) Or Concrete Floor With In-Situ Molded Concrete, Made On Site, Conventional Finish, Thickness 8 Cm, Reinforced, Resettlement Of Rectangular Blocks For Interlocking Floor, Thickness Of 6 Cm, On Sidewalk, With Reuse Of Rectangular Blocks - Removal And Installation Included Of Material. Af_12/2020, Horizontal Excavation, Including Loading And Unloading In 1St Category Soil With Crawler Tractor (170Hp/Blade: 5, 20M3). Af_07/2020
|