Cleaning Services – Hhm Technological Equipment Fire Protection Cleaning. In The Bkm Budapesti Közművek Nonprofit Private Limited Liability Company (Hereinafter: Hhm) Hhm Technology Equipment, Cleaning Of Work And Fire Protection And Cleaning Of Facades And Glass Surfaces In The Quantity And Regularity According To The Technical Description. The Service Covers The Work And Fire Protection Cleaning Of The Hhm Waste Bunker Area (Technical Description Point No. 2.1), As Well As The Cleaning Of Various Glass And Facade Surfaces Of The Hhm (Technical Description Point No. 2.2). The Tenderer Wishes To Specify The Total Quantity By Specifying The Frame Amount, Which Is Huf 97,000,000 Net. The Tenderer Undertakes To Draw 70% Of The Net Amount. It Lasts For 24 Months From The Date Of Entry Into Force Of The Contract, Or Until The Date Of Exhaustion Of The Framework Amount, If The Earlier Occurs. The Work And Fire Protection Cleaning Of The Hhm Waste Bunker Area Must Be Carried Out With The Following Frequency: Monthly (500 M2): -Dedusting Of The Bridge Structure Of The 2 Bridge Cranes Operating In The Waste Bunker Area, -Cleaning Of The Podiums That Provide Access To The Bridge Structure Of The Cranes Stopped At The End Of The Crane Track, Both From The Boiler House And The Ramp Side -The Work 20 Working Days From The Order Are Available To Carry Out At An Agreed Time Quarterly Regularity (800 M2): -Dedusting Of 2 Floating Cable Carts Along The Crane Track And The Cable Assembly Podiums, -Dedusting Of The Roofs Of Two Crane Operator Cabins, -Visitor Room Next To The Operator Cabin Of Crane Number 1 And To The Operator Cabin Dedusting Of The Main Traffic Corridor, -Cleaning Of The Crane Assembly Positions (Not The Part Between The Boiler Hoppers) At The Waste Bunker +20,000 M Level At Both Ends Of The Boiler Feed Hopper Level, And The Cover And Surroundings Of The Assembly Opening On The Ramp Side Of The Crane Operators Cabin In The Waste Bunker Area 1 - 20 Working Days From The Date Of The Order Are Available To Carry Out The Work At An Agreed Time Annually (3070 M2): -Dedusting Of The Suspended Corridor On The Side Of The Ramp (Passenger Next To The Crane Rail Track) And The Suspended Corridor Under The Sloping Roof Above The Boiler Feed Hoppers, -Longitudinal Rail Tracks Shared By Two Cranes (3070 M2) (On The Side Of The Boiler And On The Side Of The Ramps), -Cleaning The Entire Length Of The Waste Bunker +20,000 M Boiler Feed Hopper Level, Between Each Boiler Feed Hopper And The Two Crane Assembly Stations, As Well As The Cover And Surroundings Of The Assembly Opening On The Ramp Side Of The Waste Bunker Area Crane No. 1 - 20 Working Days From The Order Date Are Available To Carry Out The Work At An Agreed Time Construction, Maintenance, Repair And Cleaning Of The Plastic Mesh And Support Structure Of The Ramp Above The Inlet Openings Construction: - Construction Of Rope Stands, 1 Time, - Surface Preparation And Cleaning With High-Pressure Washing, - Stretching Of Steel Wire Braid S With Hooks, Spanifers, The Necessary Intermediate Elements, System: 700 M2, -Uv. Stretching And Fixing A Standing Plastic Net To The Wire With Clips, System: 700
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78265772
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.