Renovation Of The Roof Of The Palace Complex (Main Body). A Detailed Description Of The Subject Of The Order Can Be Found In The Swz:A) Documentation Of The Technical Design For The Renovation Of The Roof Of The Palace Complex Building (Main Body) - Annex No. 1 To Swzb) Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb) - Annex No. 2 To Swzc) Bill Of Quantities - Annex No. 3 To Swzd) Construction Permit Issued By The Starosta Of Leszczyński. Decision No. 770/2022 Of November 29, 2022 - Annex No. 4 To Swze) Permits Of The Wielkopolska Provincial Conservator Of Monuments In Poznań, Delegation In Leszno. Permit No. 109/2021/A Of March 2, 2021, Decision No. 119/A/2023 Of August 24, 2023 - Annex No. 5 To The Swznote: • The Design Documentation And Technical Specifications Indicate The Opal And Opal Berliner Ceramic Plain Roof Tiles. . The Designer Agrees To Use An Equivalent Roof Tile With The Same Stylistic And Technical Parameters, E.G. Wienerberger Roof Tile, Naturally Fluted Plain Tile, Long (38X15.5 Cm), Natural Color.• The Attached Bills Of Quantities Are For Auxiliary And Indicative Purposes Only, And The Basis For Preparing The Offer Is The Design Documentation And Stwiorb.• The Ordering Party Envisages Invalidation Of The Procedure If The Public Funds It Intends To Use To Finance All Or Part Of The Order Are Not Granted. The Contractor Is Obliged To Complete The Order On The Terms And Conditions Described In The Tor, Taking Into Account The Following Conditions For The Implementation Of The Task:• The Implementation Of The Works Will Be Take Place In An Open Facility, Because The Building At Ul. Mielżyńskich 14 Will Not Be Closed For Use During The Works.• Carry Out The Works In Accordance With Applicable Regulations.• Securing The Construction Site, Including The Construction Facilities, At Your Own Expense, In Accordance With Occupational Health And Safety Regulations And Fire Protection Regulations.• The Works Must Be Carried Out In Accordance With The Design Documentation And Conservation Permit. • The Contractor Is Fully Responsible For The Health And Life Of Employees On The Construction Site And Persons Who May Be In The Immediate Danger Zone. If The Work Is Performed By Subcontractors, The Contractor Is Mainly Responsible For The Above. • The Contractor Will Be Obliged To Constantly Clean The Area Of Work Being Carried Out. The Contractor Will Ensure The Removal And Disposal Of Waste Generated As A Result Of The Implementation Of The Works In Accordance With Applicable Regulations.• The Contractor Will Be Obliged To Return To The Ordering Party All The Dismantled Copper Sheets From The Roof Covering.• The Contractor Will Organize The Construction In A Way That Enables Supervision Of The Works Carried Out By Representatives Of The State Construction Supervision Inspectorate And Representatives Of The Appropriate Conservator Of Monuments.• Before The Start Of Construction, The Contractor Will Prepare A Safety And Health Protection Plan And Submit It To The Ordering Party For Approval.• The Contractor Is Obliged To Include In The Offer All Works And Activities Without Which The Order Cannot Be Properly Performed.• Costs Resulting From The Above Implementation Conditions And The Above Obligations Of The Contractor Should Be Included In The Offer.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78229181
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.