The Subject Of The Order Is The Design And Construction Of The Giżyckie Generation Center In Giżycko As Part Of The Task Entitled: Modernization Of The Former Fala Cinema Building Into The Giżycko Generation Center - Stage I - In The Design And Build Formula In Accordance With The Assumptions Of The Functional And Utility Program (Hereinafter Pfu) Together With The Performance Of Authors Supervision. The Functional And Utility Program Constitutes Annex No. 8 To This Procedure. The Scope Of The Order Includes: Stage I - Preparation Of Design And Cost Documentation Together With Obtaining The Final Decision On The Building Permit: The Scope Of Work Includes, In Particular, :A) Architectural And Construction Concept With A Technical, Technological, Material Description And A Drawing Part (Projections Of All Floors, Cross-Sections, Elevations, Land Development, Interior Design And Furnishing Design Of The Public Area Of The Foyer) Divided Into Individual Stages Of All Parts Of The Investment Covered By Ffu - 2 Copies,B) The Construction Design Along With Obtaining All Arrangements, Programs, Studies, Expert Opinions, Consents, Reports, Opinions, Conditions, Deviations, Decisions And Geodetic And Cartographic Studies Necessary To Obtain A Building Permit (Including Obtaining It) For The Renovation Of The Foyer And The Addition Of A Staircase - 4 Copies, C) Industry Detailed Designs In Paper Version - 2 Copies, D) Green Areas Design Including, In Particular, The Location And List Of Designed Plants Along With A Species List (Polish And Latin Name) And Quantity, A Plan To Protect The Existing Trees (Aboveground Part And Root Ball) For The Duration Of The Works, Description Of The Care Of The Species. – 2 Copies, E) Detailed Offer Cost Estimate Together With The Bill Of Quantities Of Works, Prepared In An Industry-Specific Manner, As Separate Studies For Individual Types Of Works And Works – 2 Copies, F) Technical Specifications For The Execution And Acceptance Of Works – 3 Copies, G) Electronic Version Of All Studies On Described On A Cd Or Dvd In A Non-Editable .Pdf And Editable Form - Acceptable Text Formats: .Doc, .Docx, .Rtf, Drawing Formats: .Dwg/.Dxf, Estimate Formats: .Ath.H) Authors Supervision In The Scope Of Works Specified In Stage Ii .Note 1: The Cost Of Stage I May Not Exceed 7% Of The Gross Offer Price. Note 2: The Conditions Of Network Operators And Other Documents (Such As Permits, Issued Conditions, Consents, Arrangements) Included In The Pfu And Made Available By The Ordering Party Require Adaptation To Current Requirements The Ordering Party In Relation To The Investment Implementation Assumptions And Updating Or Obtaining New Documents By The Contractor. Their Inclusion Is For Illustrative Purposes And Is Intended To Provide A Better Description Of The Order For The Future Contractor. Note 3: The Contractor Is Obliged To Consult, Agree, And Obtain The Final Acceptance Of The Ordering Party For Individual Technical And Functional Solutions That Will Be Included In The Design Documentation. Note 4: The Study Area Has Been Marked In The Graphic Attachment. Stage Ii - Execution Of Construction Works And Obtaining The Final Decision On The Occupancy Permit. The Scope Of Works Includes In Particular: A) Demolition Works Of The Existing Part Of The Building Not Covered By The Conservators Protection, B) Demolition Works Land Development Elements (Including Elements Of Small Architecture, Devices, Retaining Structures, Walls, Stairs, Ramps, Communication Routes, Etc.), C) Earthworks, D) Renovation, Extension, Superstructure, Reconstruction Of The Historic Part Of The Building And Installations On Giżycko Generation Center,E) Renovation And Thermal Modernization Works Of The Existing Part Of The Building Under Conservation Protection,F) Restoration And Conservation Works Of The Existing Part Of The Building Under Conservation Protection,G) Replacement Of The Hardened Surface With The Same One As On The Sidewalks Of Ul. Warszawska,H) Construction And Reconstruction Of Communication Routes (Including, Among Others: Sidewalks, Bicycle Paths, Access To The Building, Stairs, Ramps),I) Construction, Reconstruction, Renovation Of Retaining Structures,J) Construction, Reconstruction Of Connections To The Building And Devices,K) Removing Collisions With Technical Infrastructure,L) Construction Of A Cctv Monitoring Installation With Connection To The Municipal Network,M) Equipping The Area With Small Architecture - Benches, Baskets, Information Boards, Bicycle Racks, N) Planting Plants (Perennials, Shrubs, Trees), Extensive Surfaces (Lawns, Flower Meadows) And Care Of Existing Plantings, O) Transport And Disposal Of Debris, P) Obtaining An Occupancy Permit, Note: The Study Area Has Been Marked In The Graphic Attachment. Stage Iii - Maintenance Of The Completed Vegetation During The Warranty Period: A) Warranty Period For Trees - 24 Months From The Date Of Completion Of Final Acceptance, B) Warranty Period For Perennials And Shrubs - 12 Months From The Date Of Completion Of Final Acceptance, C) Scope Of Maintenance: - Weeding Areas With Planted Shrubs And Perennials, - Pruning Trees And Shrubs, - Watering Perennials, Shrubs And Trees, - Replacement Of Tree Stakes, - Possibly Replacement Of Dead Seedlings, - Disposal Of Waste Generated As Part Of Greenery Management. Due To The Limited Number Of Characters Entered In The Announcement, A Detailed Description Of The Subject Of The Order Includes Swz Together With Attachments.
|