1. The Subject Of The Order Is The Reconstruction Of The Staircase Of The Building At Ul. Klonowa 5 In Katowice The Works Will Consist In Particular In: 1) Replacing External Doors 2) Inserting Steel Doors 3) Making And Completing Plasters 4) Painting Plasters 5) Repairing The Floor And Steps 6) Dismantling Boxes, Switchboards, Fixtures, Connectors, Boxes, Cables 7) Disassembly Of Electricity Meters 8) Installation Of Led Fixtures With Motion Sensors, Fixtures With A Dusk Sensor 9) Installation Of Lighting Fixtures, Boxes, Connectors, Taps 10) Installation Of Installation Pipes, Cables 11) Installation Of Meter Boxes, Boards, Electricity Meters 12) Execution Fire Protection Switch For The Facility 13) Installation Tests 14) Installation Of The Intercom Switchboard, Call Board, Electric Strike, Door Closer 15) Installation Of Internal Communication Devices 16) Installation Of Cable And Plug-In Cables 17) Commissioning And Post-Installation Tests Of The Intercom System 2. The Ordering Party Requires That The Contractor Provided A Warranty Of No Less Than 60 Months For The Construction Works Performed.3. A Detailed Description Of The Subject Of The Order Is Provided By: - Technical Specification For The Execution And Acceptance Of Works (Stwior) Constituting Annex No. 4 To The Swz, - Bill Of Quantities Constituting Annex No. 5 To The Swz. -The Draft Provisions Of The Contract Constituting Annex No. 3 To The Swz, Attention! Bills Of Quantities In Ath Format Are Attached As A Guide. In The Event Of Discrepancies Between The Bill Of Quantities In The Pdf Format And The Bill Of Quantities In The Ath Format, The Records Of The Bill Of Quantities In The Pdf Format Are Binding. Attention! The Works Covered By The Subject Of The Order Will Be Carried Out In An Occupied Building And Inhabited Premises And Require Specific Dates For The Works To Be Carried Out In The Premises During The Term Of The Contract With The Tenants. The Contractor Will Be Obliged To Maintain The Patency And Cleanliness Of The Communication Routes Used. 4. Equivalence Parameters: 1) If The Stwior Or Bill Of Quantities Would Indicate, In Relation To Certain Materials And Devices, Patents Or Origin, Sources Or A Specific Process That Characterizes Products Or Services Provided By A Specific Contractor, Trademarks Or Origin, Or Standards, European Assessments Were Indicated Technical Specifications, Common Technical Specifications Or Other References Referred To In Article 101 Section 1 Point 2 Or Section 3 Of The Act, The Ordering Party In Accordance With Art. 99 Section 4 And 5 Of The Act Allows The Submission Of Products Equivalent Or In Accordance With Art. 101 Section 4 Of The Act, Offering Solutions Equivalent To Those Indicated In The Documentation, Provided That They Ensure Technical Parameters Not Worse Than Those Assumed In The Documentation And Are Consistent In Terms Of: A) Dimensions And Structure (Size, Type, Unit Weight, Permissible Span And Length Elements, Physical Properties, Number Of Components, Etc.), B) Functional Nature (Identity Of Functions), C) Material Characteristics (Type And Quality Of Materials), D) Technical Parameters (Strength, Durability, Technical Data, Hydraulic Data, Linear Characteristics, Construction), E) Operational Safety Parameters. All Products From Specific Manufacturers Specify The Minimum Quality Parameters And Functional Features That The Goods Must Meet In Order To Meet The Requirements Set By The Ordering Party And Constitute Only A Quality Standard Of The Subject Of The Order. By Recording The Minimum Requirements For Quality Parameters, The Ordering Party Understands The Requirements Of The Goods Contained In Publicly Available Sources, Catalogs And Manufacturers Websites. The Use Of Exemplary Manufacturers Names Is Only Intended To Clarify The Level Of Expectations Of The Ordering Party In Relation To A Specific Solution. So, The Use Of Manufacturer/Product/Names Is For Example Purposes Only. In Such A Situation, The Ordering Party Requires The Submission Of Appropriate Documents Authenticating These Materials Or Devices. They Will Be Assessed During The Offer Examination. 2) Where In The Stwior Or Bill Of Quantities The Subject Of The Contract Is Described Using Performance Or Functionality Requirements, Standards, Technical Assessments And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Act, The Contracting Authority Allows Solutions Equivalent To Those Described. In Such A Situation, The Ordering Party Requires The Submission Of Appropriate Documents Authenticating These Materials Or Devices. They Will Be Assessed During The Offer Examination. 5. The Means Of Evidence In Question. If Materials, Devices, Products Or Equivalent Solutions Are Used, The Contractor Is Obliged To Indicate Them In The Offer And To Submit, Together With The Offer, Technical Data Sheets Or Other Documents Confirming That The Offered Equivalent Solutions Meet The Requirements Of The Ordering Party Described In The Subject Of The Order. If The Contractor Does Not Submit The Above-Mentioned Documents Or The Submitted Documents Will Be Incomplete (Thus Not Confirming The Equivalence Of The Offer In The Scope Described In The Description Of The Subject Of The Order, The Ordering Party Will Not Request Their Submission/Supplementation).6. The Warranty Period Required By The Ordering Party For The Completed Construction Works Is Not Shorter Than 60 Months;7. Employment Requirement Under An Employment Contract (Social Clause): Employment Requirement Under An Employment Contract (Social Aspects): The Ordering Partys Requirements Regarding Employment Under An Employment Contract Are Included In § 8 Of The Draft Provisions Of The Contract. (Appendix No. 3 To Swz).8. The Requirement To Meet The Requirements Specified In The Provisions Of The Act Of January 11, 2018 On Electromobility And Alternative Fuels (Journal Of Laws Of 2023, Item 875, As Amended) Is Specified In § 8 Of The Draft Provisions Of The Contract (Annex No. 3 To The Swz).
|