Work Detail
Construction Work – Ts - Expansion Stage I Düren Group Sewage Treatment Plant - Construction Technology Objects 1 & 3. Special Civil Engineering: 1,880 M Of Drillings For Bored Pile Walls (Vkb 1&2) 1,100 M Of Drillings For Bored Pile Walls (Comi Basin 1) 1,100 M Of Drillings For Bored Pile Walls (Pre-Thickener) 213 M2 Of Drilled/Free-Standing Support Pile Wall (Relief Structure) 189 M2 Of Drilled/Stiffened Support Pile Wall (Biology Distribution Structure) 117 M 2 Drilled /Stiffened Support Pile Wall (Shaft A) 300 M2 Sheet Pile Wall (Drainage Shaft 1) 300 M2 Sheet Pile Wall (Drainage Shaft 2) 856 M2 Pull Existing Sheet Pile Wall (Technical Building) 428 M2 Pull Existing Sheet Pile Wall (Distribution Structure Vkb) 2,781 M2 Trench Shoring (Buried Lines) 1,250 M2 Trench Shoring (Surface Drainage ) 560 M2 Trench Shoring (Exhaust Air Treatment) Earth Movements: The Subsoil Excavation Results From Construction Pits And Line Trenches Subsoil Excavation Unloaded 22,942 M3 Subsoil Excavation Loaded 10,084 M3 Subsoil Installation 51,641 M3 Topsoil Excavation 2,500 M3 Topsoil Installation 9,800 M3 Shell Construction Work In-Situ Concrete 365,231.282 M3 Concrete Rod Steel 307,573,982 T Formwork 306,871,082 M2
Other Detail
View Original Notice/Document
Download
View Notice Now...
Fill Detail for Getting Instant Access
Instant Access