Works For Complete Or Part Construction And Civil Engineering Work – Construction Of Mv Terminals From Rs Winnica (Lsn Gołądkowo, Lsn Skorosze, Lsn Piskornia, Lsn Gnaty, Lsn Domosław, Lsn Błędostowo) With Network Automation. 1. The Subject Of The Order Is The Performance Of Construction And Assembly Works For The Task: Construction Of Mv Terminals From Rs Winnica (Lsn Gołądkowo, Lsn Skorosze, Lsn Piskornia, Lsn Gnaty, Lsn Domosław, Lsn Błędostowo) With Network Automation. 1) The Task In Question Consists Of: A) Construction Of The Mv-15 Kv Power Grid, B) Construction Of The Lv - 0.4 Kv Power Grid In The Form Of An Lv - 0.4 Kv Overhead Line And Demolition Of A Fragment Of The Lv - 0.4 Kv Power Grid, C) Construction Of The Sn-15 Kv Cable Power Network And Reconstruction Of The Sn-15 Kv Overhead Power Network. D) Reconstruction Of Existing Sn-15 Kv Pole Positions In Terms Of Replacing Connectors And Establishing New Network Divisions. 2) The Scope Of Works Includes: A) Construction Of The Sn-15 Kv Power Network In The Form Of Cable Lines: - Lsn Gnaty, 2,583 M Long - Lsn Skorosze, 3,457 M Long - Lsn Domosław, 2,575 M Long - Lsn Błędostowo With A Length Of 4,974 M - Lsn Gołądkowo With A Length Of 2,254 M - Lsn Piskornia With A Length Of 5,768 M And Reconstruction/Construction Of Mv Pole Stations Along With The Installation Of Mv Disconnectors, In Order To Connect The Rs Winnica T721813 Network Switching Station With The Existing Mv 15Kv Power Grid Towards The Towns: Winniczka, Domosław, Mieszki Leśniki, Glinice Wielkie, Rębkowo, Gnaty Lewiski - (Volume E3). B) Construction Of The Lv Power Network - 0.4 Kv In The Form Of An Overhead Line Lv - 0.4 Kv - 250.1 M With 7 Pcs. Of Lv Power Poles And Demolition Of A Fragment Of The Lv Power Network - 0.4 Kv - 234 M With Poles Nn - 6 Pcs In Mieszki Leśniki, Winnica Commune, Poviat Pułtuski - (Volume E3/Nn). C) Construction Of The Sn-15 Kv Cable Power Network Type 3 X Na2xs(Fl)2Y (Xruhakxs) 1X150/25 - 1,360 M, Replacement Of The Mv Pole And Reconstruction (Replacement) Of The Sn-15Kv Overhead Power Network With Sn Pole Stations To A Line Type : 3 X Ecopas-70 – 1,530 M. And Line: 3 X Ecopas-50 – 198 M., Installation Of Mv Disconnectors - In Płocochowo And Niestepowo Włościańskie - (Volume E4). D) Reconstruction Of Existing Mv-15 Kv Pole Stations In Terms Of Replacing Connectors And Establishing New Network Divisions, Installation Of Mv Disconnectors - (Volume E5) The Detailed Scope Of Work Is Included In The Design Documentation. Specification And Description Of Accompanying Works And Temporary Works, As Well As Bill Of Quantities And Measurements Of Works - In Accordance With The Design Documentation. The Contractor Is Obliged To Thoroughly Familiarize Himself With The Standards Constituting Annexes To The Swz Due To The Clarifications They Contain Regarding The Execution Of The Order, Including, Among Others: Providing Documents With Delivery. 2. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Constituting Annex No. 12 To The Swz. The Ordering Party Requires That The Subject Of The Order Be Performed In Accordance With The Guidelines Indicated In This Documentation (Annex No. 3 To The Swz) And Instructions, As Well As The Standards Constituting An Annex To The Swz (Annex No. 14 To The Swz) And The Draft Provisions Of The Contract (Annex No. 13 To The Swz). Contractor Of Obligations
|