Sewer Cleaning Services – Maintenance Of Rainwater Drainage Systems. The Tenderers Task Is To Clean, Maintain, Renovate And Rebuild The Stormwater Drainage Systems Owned And Managed By The Municipality Of Göd (Open Ground And Paved Ditches, With Their Associated Benches And Culverts, Closed Stormwater Drainage Channels, And Their Associated Sludge Catchment And Cleaning Shafts). The Tenderer Wishes To Enter Into A Framework Agreement For A Net Sum Of Huf 300,000,000, I.E. Three Hundred Million Forints, But For A Maximum Period Of 3 Years. The Applicant Is Entitled To An Order With A Total Value Corresponding To The Limit Amount, But Is Not Obliged To Exhaust The Limit. Expected For The Following Types Of Work: 1. Cleaning Of Open Paved Trenches, With The Removal Of Excavated Material 2. Cleaning Of Sludge Catch And Cleaning Manholes, With The Removal Of Excavated Material 3. Cleaning And Profiling Of Earth-Bed Trenches, With The Removal Of Excavated Material 4. Arrangement Of Existing Benches, (Bench Fall) With Removal Of Extracted Material 5. Cleaning Of Closed System Rainwater Drainage Channels (Pipes Of Variable Diameter And Material), With Removal Of Extracted Material, Billed Per Operating Hour 6. Camera Inspection Of The Cleaned Pipeline, Billed Per Operating Hour 7. Cleaning Of The Rainwater Transfer Pump Shaft (Szent Imre Herzeg Utca) By Transporting Material 8. Cleaning Of Culverts By Transporting Excavated Material 9. Renovation Of An Existing Trench With Prefabricated Concrete Slabs By Transferring Reusable Slabs, Etc. With Head Beam Closure 10. Paving Of An Earth-Bed Trench With Concrete Elements With Turf, Etc. With Head Beam Closure 11. Paving Of An Earthen Trench With Prefabricated Concrete Slabs Etc. With Head Beam Closure 12. Cleaning Of An Existing River Place Of Work: Göd Administrative Area, Detailed Locations Are Included In The Individual Orders. The Material Removed From The Open Earth Bed, From The Paved Trenches, From The Closed Rainwater Drainage Canals, And From Sludge Catchment Shafts And Culverts Must Be Placed By The Contractor (Transported In Accordance With The Legal Regulations), The Customer Does Not Provide An Area For Depositing Or Storing The Removed Material. The Number Of Mobilized Machines Is Determined By The Contractor Depending On The Efficiency, Therefore He Is Also Obliged To Take Care Of The Necessary Shift And Support Staff. The Contractor Is Obliged To Organize And Carry Out The Work In Such A Way As To Keep The Routes In A Condition Suitable For Road Traffic. If He Does Not Fulfill His Duties, The Client May Engage Another Contractor To Carry Out The Work At The Contractors Expense. During The Duration Of The Framework Agreement, It Is Expected That Approximately 5 Individual Contracts Will Be Concluded At The Same Time, A Maximum Of 2 At A Time. Expected Completion Length Of Individual Contracts: 6 Km. The Detailed Technical Description And Quantitative Data Of The Public Procurement Are Contained In The Public Procurement Documents. Where The Tenderer Referred To A Make, Type, Origin, Patent Or Trademark In The Public Procurement Documents, The Designation Is Only A Sufficiently Precise And Comprehensible Description Of The Subject Of The Contract, For
|