Locomotive-Substations Construction Works – Bhns Part-Dieu <> Sept Chemins - Building And Traction Energy Works Contract (Sst). >_The Services Include: #For The Building Component: >Carrying Out Additional Geotechnical Surveys For The Building To Be Built, >Complementary Topographical Surveys Necessary For The Studies And Construction Of The Building To Be Built, >Earthworks, Structural Work, Second Work Of The Substation Of The Building To Be Constructed. >The Second Work Of The Substation, The Civil Engineering Of Which Is Carried Out By The T6n Project. #For The Energy Component: >Equipment Of The Traction Distribution Stations Of The New Trolley Substations, >Modification Of The Electric And Low Voltage Traction Installations Of The Existing Network, >Installations Of Boxes And In-Line Cabinets For Traction Power Supply, >Unwinding Of Cables Traction, Lv, Control, Earthing In Line And In Substation. >_The Contract Execution Period Is 31 Months From The Date Set By The Os Prescribing The Start Of The Preparation Period And The Execution Studies Period
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78214309
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.